Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5993Cytec Industries Inc.7910 Mount Joy RoadMount PleasantMauryColumbia

Permit Information

TN0067415
Individual
Reissuance
CYTEC Industries Inc.
Waste water discharges associated with the production of Industrial Organic Chemicals, NEC
M
P
PW, NPW, CCW, SW
01-MAR-2023
15-DEC-2010
23-MAR-2023
15-AUG-2023
16-SEP-2023
01-NOV-2023
31-AUG-2028
Big Bigby Creek at mile 15.4 (Outfall 001), 15.6 (Outfall 002 & Outfall 004A) and mile 15.1 (Outfall 003)
boiler and cooling tower blowdown, unrecovered cooling water and boiler condensate and stormwater runoff from Outfall 001, utility blowdown, steam condensate and stormwater runoff from Outfall 002 and process wastewater, contaminated stormwater runoff from Outfall 003, cumulative nutrients via Surrogate Outfall 004A, and to operate a Cooling Water Intake Structure.
filtration, carbon adsorption (Outfall 001); equalization, sedimentation (Outfall 002); neutralization, activated sludge (rotating biological contactors), multi-media filtration and carbon adsorption (Outfall 003); Surrogate Outfall 004A
2869
2899
.086
23-JAN-2024 05:00PM

Other DWR permits at this site

  • 1 - 1 of 1
  • 1 - 1 of 1

Permit Documents

View
MemoCertification of Pollution Control Equipment26-DEC-2013
Letter2014 CYTEC Response to QNCR NOV Apr22-APR-2014
LetterRCVD 05-JUN-14: letter re: payment of fee by Amy Mather.05-JUN-2014
Inspection Report2014 CEI November26-NOV-2014
Form2014 ICIS Entry November02-DEC-2014
Report2015 Second Semiannual Toxicity 00309-JUL-2015
Report2015 Second Semiannual Toxicity 00109-JUL-2015
Report2015 Second Semiannual Toxicity 00209-JUL-2015
FormREF 01-OCT-15: form re: pollution control equipment certification by Travis Martin.01-OCT-2015
Memo2015 Permit Memo Oct23-OCT-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

14-AUG-2024Compliance Eval (non-sampling) (CEI)In Compliance
30-AUG-2023Compliance Eval (non-sampling) (CEI)In Compliance
19-MAR-2021Compliance Biomonitoring (CBI)In Compliance
16-JAN-2020Compliance Eval (non-sampling) (CEI)In Compliance
25-OCT-2017Compliance Eval (non-sampling) (CEI)In Compliance
06-DEC-2016Compliance Sampling (CSI)In Compliance
21-OCT-2015Compliance Eval (non-sampling) (CEI)In Compliance
18-NOV-2014Compliance Eval (non-sampling) (CEI)In Compliance
06-NOV-2013Compliance Eval (non-sampling) (CEI)In Compliance
27-NOV-2012Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review