Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5061Englewood STPChestuee & Second StreetEnglewoodMcMinnChattanooga

Permit Information

TN0021938
Individual
Reissuance
Town of Englewood
Englewood STP
Oxidation ditch (modified activated sludge) wastewater treatment plant with chlorination
I
M
MW
07-JAN-2022
24-JAN-2022
21-JUN-2022
22-JUL-2022
01-SEP-2022
31-AUG-2027
Chestuee Creek Mile 42.4
treated municipal wastewater from Outfall 001
Oxidation ditch activated sludge plant with chlorination
4952
.25
01-JUN-2023 01:51PM

Other DWR permits at this site

Permit Documents

View
ModelModified Streeter Phelps Models - 1995 and 198519-JAN-1995
Engineering Drawings-PlansFacility schematic/process diagram - unknown date01-JAN-2000
ApplicationNPDES permit application by Curtis Runkles and Robert Cass14-MAY-2012
LetterNotice of complete pmt app08-JUN-2012
Old PermitFinal permit. Issue 8/1/12.01-AUG-2012
MemoSummary of SSOs from 2011-2012 DMRs14-AUG-2012
Inspection ReportEnglewood Compliance Evaluation Inspection 201203-DEC-2012
LetterEverlasting Baptist Church letter11-DEC-2012
LetterEnglewood response to SSO problem22-JAN-2013
LetterEnglewood Application to SRF Coll system04-FEB-2013
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterAction taken 1/14/13 notified by letter dated 1/17/131/14/2013Active81
Chronic OverflowsLetterNotice of Violation issued on 12/14/2012 for chronic overflows at three locations. Response to NOV on 1/14/2013 state that the Board of Alderman had voted to implement self imposed moratorium.1/14/2013Active

Inspections

15-MAY-2023Compliance AssistanceIn Compliance
15-SEP-2021Compliance Eval (non-sampling) (CEI)In Compliance
26-MAY-2021Sanitary Sewer Overflow Non-SamplingOut of Compliance
06-OCT-2017Compliance AssistanceIn Compliance
29-SEP-2017Compliance Eval (non-sampling) (CEI)In Compliance
20-SEP-2012Compliance Eval (non-sampling) (CEI)NOV
19-MAY-2008Compliance Eval (non-sampling) (CEI)NOV

Wastewater Engineering Plans Review

23.0271ApprovedCDTNH5/27/20236/21/2023ENGLEWOOD - 2021 CDBG AND ARPA SEWER SYSTEM IMPROVEMENTS
20.0327ApprovedCDA. Bahour6/16/20206/16/20202018 CDBG Sewer Improvements-Town of Englewood
15.0449Review CompleteLINEA. Bahour8/24/2015-Athens Housing Authority Sanitary Sewer Replacement
13.0290Review CompletePERJMS5/29/20137/3/20132013 CDBG - Town of Englewood Sewer System Rehab and Reduce of Inflow and Infiltration