Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
14886Town of Arlington Wastewater Treatment PlantNorth of CSX Railroad, West of Hwy 385, South of the Loosahatchie RiverArlingtonShelbyMemphis

Permit Information

TN0078603
Individual
Modification
Town of Arlington
Arlington WWTP (11150 Highway 70)
treatment of municipal wastewater using Sequencing Batch Reactor, ultraviolet disinfection and equalization/surge basin. Expanding design flow rate from 2.5 MGD to 5 MGD. The permittee determines that the greater than de minimis degradation is justified to support areawide growth out of both the Memphis metropolitan area and the Ford Blue Oval City and will not result in pollution.
M
M
MW
15-MAY-2024
04-JUN-2024
31-JUL-2024
06-SEP-2024
01-OCT-2024
30-NOV-2027
Loosahatchie River at mile 29.2
treated municipal wastewater from Outfall 001
4952
2.5
06-SEP-2024 10:28AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR151751Town of Arlington-CGPInactiveN/AMemphis-30-SEP-2005-
TNB078603Town of Arlington-BiosolidsActiveN/AMemphis10-JUN-202210-JUN-202215-AUG-2024
  • 1 - 2 of 2

Permit Documents

View
LetterExplanation of Permit Violations for August 202413-SEP-2024
PermitFinal permit; Issue 9/6/2406-SEP-2024
LetterPT PTL Twn Ltr 5 MGD08-AUG-2024
Draft PermitDraft permit; PN 7/30/2431-JUL-2024
Letter24.0452 Approval letter 2024073030-JUL-2024
LetterWPN24.0375 PER ESU Acceptance Letter 2024061818-JUN-2024
Letter24.0438 Plans Approval LTR 2024061717-JUN-2024
ApplicationRCVD VIA EMAIL 15-MAY-24: Form 2A w/ rqst for mod from 2.5MGD to 5.0MGD by Gilbert Rivera15-MAY-2024
LetterWPN24.0007 Approval Letter 2024051515-MAY-2024
LetterPT SUO/ERP Final Approval18-APR-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

01-AUG-2024Pretreatment AuditPending
06-MAR-2023Compliance Eval (non-sampling) (CEI)In Compliance
06-MAR-2023Pretreatment TAV and File ReviewIn Compliance
25-MAR-2022Pretreatment Compliance (oversight)In Compliance
05-MAY-2021Pretreatment TAV and File ReviewIn Compliance
22-FEB-2021Compliance Eval (non-sampling) (CEI)In Compliance
28-FEB-2020Pretreatment Compliance (oversight)In Compliance
08-AUG-2019Compliance AssistanceImmediately Corrected During Inspection
16-JUL-2019Pretreatment AuditIn Compliance
10-APR-2019Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

04.1047ApprovedSTDSPECMBS9/9/20049/24/2004STD SPECS
13.0489ApprovedLINEMNU8/5/20139/9/2013Windsor Place 1st Addition
14.0081ApprovedLINEA. Bahour2/5/20143/27/2014Hall Creek Apartments
14.0112ApprovedLINEA. Bahour2/24/20144/9/2014Wilsons Crossing P. D., Phase 1
14.0148ApprovedSTDSPECA. Bahour3/13/20143/21/2014Standard Specifications for Sanitary Sewer Construction
14.0673ApprovedLINEA. Bahour8/28/20149/29/2014Lot 3, Landvest Highway 70 S/D
15.0133ApprovedLINEMNU2/26/20153/27/2015Windsor Place 1st Addition
16.0180Approved-MNU3/11/20163/24/2016Hayes Place PD
16.0144Approved-MNU3/22/20163/22/2016Wilsons Crossing PD Phase 2
16.0317ApprovedLINEMNU4/26/20165/12/2016Shops at Arlington Village