Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
5059
Portland STP
124 Morningside Drive
Portland
Sumner
Nashville
Permit Information
Permit Number
TN0021865
Permit Type
Individual
Status
Reissuance
Permittee Name
City of Portland
Project Name
Portland STP
Activity Description
Treatment of municipal sewage via two sequencing batch reactors (1.9 MGD) and three sequencing batch reactors in Fall 2024 (2.85 MGD) with chlorine disinfecting and dechlorination. The permittee will meet more stringent effluent limits to maintain formerly permitted loads with expanded treatment capacity. Residual biosolids are digested and land applied on approximately 400 acres.
Permit Rating
M
Facility Classification
M
Discharge Code
MW
Application Received
09-JUL-2024
Application Returned
03-JUL-2024
Application Complete
09-JUL-2024
Public Notice Date
16-JUL-2024
Issuance Date
19-AUG-2024
Effective Date
01-SEP-2024
Expiration Date
31-AUG-2029
Modification Date
Termination Date
Receiving Stream
Summers Branch at mile 8.6 to the Red River
Effluent Description
treated municipal wastewater from Outfall 001
Treatment Description
Sequencing Batch Reactor (SBR) activated sludge with chlorination, dechlorination, and post aeration. Sludge: was, imhoff, to land appl.
SIC Code
4952
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
2.85
Record Last Updated
07-NOV-2024 09:15AM
Other DWR permits at this site
Go
Actions
1 - 2 of 2
Permit No
Permittee Name
Project Name
Permit Type
Status
Rating
EFO Name
__Issuance__
_Effective_
__Expiration__
TNR246722
City of Portland, Tennessee
2020 Wastewater Treatment Plant Expansion
CGP
Active
N/A
Nashville
-
10-JUL-2023
30-SEP-2026
TNB021865
Portland STP
-
Biosolids
Incomplete
N/A
Nashville
-
-
-
1 - 2 of 2
Column Actions
Search
Permit Documents
Search All Documents
View Permit
FileNet Documents
View
File Type
Description
Document Date
Letter
2024 PCI Response- will incorporate flow limits in IU permits by Jan 2025 and will submit LL
04-NOV-2024
Letter
PT Prelim Approval for IU Status Change
31-OCT-2024
Letter
2024 PCI Letter- Must reissue permits with language corrections, section additions, corrected limit tables, and flow limits.
30-OCT-2024
Inspection Report
2024 PCI Inspection Checklist
30-OCT-2024
Email
PT Narrative Conditions Reminder
29-OCT-2024
Report
PT Supporting Documents for IU Status Change
21-OCT-2024
Email
Request for NOV Extension to November 18- Granted
18-OCT-2024
Letter
Letter to home owners at 123 Gravel Lane from the City if Portland requiring the home owner to repair the private sewer pump of their property. The letter gives them a deadline and explains what will happen if the repairs are not made.
23-SEP-2024
Email
Request from Jennifer Young for extension of July 2024 NOV action items, granted for October 19, 2024
17-SEP-2024
Permit
Minor Modification of total mercury sample type so it matches ICIS reporting.
16-SEP-2024
row(s) 1 - 10 of 599
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Moratorium
Problem
Mechanism
Result
Action Date
Status
Percent Annual I I
I/I:Permit Violations
Commissioner's Order
Moratorium on Connections see Item 8 under Order & Assessment Section (page 15).
4/18/2017
Active
58
Inspections
Inspection Date
Type
Result
30-OCT-2024
Pretreatment Compliance (oversight)
Out of Compliance
16-AUG-2024
Compliance Assistance
Out of Compliance
17-JUN-2024
Compliance Eval (non-sampling) (CEI)
Out of Compliance
14-JUN-2023
Pretreatment TAV and File Review
In Compliance
18-AUG-2022
Compliance Eval (non-sampling) (CEI)
Out of Compliance
07-JUL-2022
Sanitary Sewer System
In Compliance
02-JUN-2022
Pretreatment Compliance (oversight)
In Compliance
25-MAY-2021
Pretreatment Audit
Out of Compliance
03-MAR-2021
Follow-up
Out of Compliance
07-JUL-2020
Compliance Eval (non-sampling) (CEI)
Out of Compliance
row(s) 1 - 10 of 32
Next
Wastewater Engineering Plans Review
Project no
Plans Status
Type
Reviewer
Date Received
Approved Date
Project Name
12.0205
Approved
PER
Phil Simmo
4/30/2012
5/9/2012
FIDP/City of Portland/NSAG
12.0378
Approved
PER
Phil Simmo
7/26/2012
7/27/2012
City of Portland/ Shoals Technology Group
13.0102
Approved
ER
Phil Simmo
3/4/2013
5/17/2013
North Russell Street Pumping Station
13.0317
Review Complete
PER
JMS
5/29/2013
7/3/2013
2013 CDBG - City of Portland - Demase Street Basin Sewer Improvements
13.0500
Approved
STDSPEC
MNU
8/6/2013
12/4/2013
City of Portland
13.0662
Approved
LINE
A. Bahour
11/4/2013
12/5/2013
Vail Crest Subdivision 9 Lot, 18 Unit Duplex
14.0100
Approved
IMP
MNU
2/20/2014
4/2/2014
Shoals FIDP Sewer System Improvements
14.0100CO
Approved
LINE
MNU
7/21/2014
8/18/2014
Shoals FIDP Improvements
14.0641
Approved
LINE
A. Bahour
8/15/2014
9/18/2014
Jaybird Lane Sewer Line
14.0653
Approved
other
MNU
8/22/2014
10/15/2014
Sludge Dewatering Box
row(s) 1 - 10 of 75
Next