Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
6477City of Bolivar STPNuckolls RoadBolivarHardemanMemphis

Permit Information

TN0077917
Individual
Reissuance
City of Bolivar
Bolivar STP
Treatment of municipal wastewater in a lagoon with complete mix aeration cells and polishing ponds with chlorination. Modify phosphorus concentration limit to report only and limit loading as an annual rolling average.
M
M
MW
24-APR-2024
11-APR-2024
29-APR-2024
20-AUG-2024
26-SEP-2024
01-NOV-2024
30-SEP-2029
Hatchie River at mile 131.0
treated municipal wastewater from Outfall 001
Lagoon with complete mix aeration cells and polishing ponds with chlorination. Lagoon built on site of TN0025275 to replace both TN0025275 and TN0062189.
4952
1.4
26-SEP-2024 09:45AM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Letter16-0561 Letter25-JUL-2016
Letter16-0561 Ref22-JUL-2016
Letter17.0843 Approval letter22-JAN-2018
Environmental Review17.0843 Information18-DEC-2017
Letter19-0651 Letter22-OCT-2019
Letter19-0651 Ref22-OCT-2019
Letter20.0009 Cover letter06-JAN-2020
Letter20.0009 approval letter07-FEB-2020
Form2015 WW Operator Form01-SEP-2015
Form2016 Certified Oper Form04-AUG-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/IEFO Communication 4/12/2019Watch List44

Inspections

18-NOV-2022Compliance Biomonitoring (CBI)In Compliance
17-DEC-2020Compliance Eval (non-sampling) (CEI)In Compliance
05-FEB-2019Sanitary Sewer SystemIn Compliance
05-FEB-2019Compliance Eval (non-sampling) (CEI)In Compliance
07-JUN-2017Sanitary Sewer Overflow Non-SamplingIn Compliance
07-JUN-2017Compliance Eval (non-sampling) (CEI)In Compliance
17-APR-2015Compliance Biomonitoring (CBI)In Compliance
21-AUG-2014Reconnaissance (RI)Minor Deficiency Noted
07-MAR-2014Reconnaissance (RI)In Compliance
13-JAN-2014Reconnaissance (RI)In Compliance

Wastewater Engineering Plans Review

24.0416PendingPERTNH5/27/20246/18/2024City of Bolivar ARP Preliminary Engineering Report
22.0084ApprovedCDA. Bahour2/22/20223/14/20222021 CDBG Sewer System Lift Station Replacements
20.0009ApprovedCDA. Bahour2/4/20202/7/2020City of Bolivar CDBG Wastewater Collection System Improvements
19.0651ApprovedCDMNU10/8/201910/21/2019Newstead Drive Sewer Line Relocation
17.0843ApprovedIMPA. Bahour1/19/20181/22/20182017 CDBG - City of Bolivar
16.0561ApprovedFMMNU7/19/20167/25/2016Holding Tank Pumping Facility & Force Main
14.0801ApprovedREHABMNU10/27/20141/5/2015Rehabilitation of the Jackson Hills and Lynndale Stations
14.0785ApprovedREHABA. Bahour10/16/201412/10/2014Collection System Improvements
12.0477Review CompletePERJMS7/26/20128/16/2012CDBG-2012 - Bolivar Sewer System Improvements-Phase II