Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5146Lexington Utilities- Waste Water Treatment Plant677 South Main Street; mail to 54 Monroe Ave.LexingtonHendersonJackson

Permit Information

TN0024341
Individual
Reissuance
City of Lexington, Utilities Division
Lexington Utilities STP
Treatment of municipal sewage by activated sludge treatment and PAA disinfection
M
M
MW
01-MAR-2023
27-MAR-2023
26-SEP-2023
30-OCT-2023
01-NOV-2023
31-OCT-2028
Beech River at mile 29.7
treated municipal wastewater from Outfall 001
Activated sludge treatment preceded by screening and flow equalization with PAA disinfection, post aeration and foam control
4952
3.2
16-APR-2024 08:25AM

Other DWR permits at this site

  • 1 - 2 of 2
  • 1 - 2 of 2

Permit Documents

View
Letter2024 TAV Letter25-APR-2024
Report2024 Lexington TAV Worksheet04-APR-2024
ReportPT IWS04-MAR-2024
LetterCEI Letter 202427-FEB-2024
EmailPT Narrative Conditions Reminder27-DEC-2023
EmailNew NetDMR reporting requirement for influent and narrative condition reminder09-NOV-2023
PermitIssued Permit 202330-OCT-2023
Public Notice DocumentREF 18-OCT-23: public notice document re: legal ad for $84 in Lexington Progress18-OCT-2023
Draft Permitdraft permit 202327-SEP-2023
LetterPT PTL Town Ltr25-SEP-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

04-APR-2024Pretreatment TAV and File ReviewIn Compliance
13-FEB-2024Compliance Eval (non-sampling) (CEI)In Compliance
25-JUL-2023Pretreatment Compliance (oversight)In Compliance
29-JUN-2022Pretreatment AuditIn Compliance
23-FEB-2022Compliance Eval (non-sampling) (CEI)In Compliance
11-FEB-2022Sanitary Sewer SystemIn Compliance
17-AUG-2021Pretreatment TAV and File ReviewIn Compliance
23-JUN-2020Pretreatment Compliance (oversight)In Compliance
16-JAN-2020Sanitary Sewer SystemIn Compliance
15-JAN-2020Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

19.0527ApprovedCAPA. Bahour10/10/201910/10/2019N. Meadow/One Mile Branch
23.0425ApprovedCDTNH8/8/20239/8/2023Beech River Pump Stations and Force Main
23.0014ApprovedCDMNU1/6/20231/24/2023Thomas Meadows S/D
22.0031ApprovedCDMNU3/28/20223/28/2022WTP Process Wastewater Pump Station, Force Main and Gravity Sewer
21.0462ApprovedCDMNU6/14/20217/9/2021Lift Station #33
21.0195ApprovedCDMJB3/9/20214/5/2021North Industrial Park Sewer Facilities Phase 2
21.0113ApprovedCDTNH3/1/20213/2/2021Lift Station #9 Removal & Skyline Drive
20.0640ApprovedCDMJB10/21/202011/18/2020Lift Station #25 Relocation
20.0583ApprovedCDZachSeiden7/1/20217/1/2021Town Branch Interceptor Sewer Replacement
20.0494ApprovedCDMJB8/6/20208/21/2020North Industrial Park Sewer Facilities