Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
6397Pegram STP5227 Walkup RoadPegramCheathamNashville

Permit Information

TN0074586
Individual
Incomplete
Town of Pegram
Pegram STP
Septic tanks, collection system, recirculating sand filter with UV disinfection with discharge to Outfall 001 (not installed), and drip irrigation disposal (fenced) to dispose of 0.036 MGD.
I
M
MW, DI
19-JUL-2024
14-AUG-2024
04-AUG-2021
26-OCT-2021
30-NOV-2021
01-JAN-2022
31-DEC-2026
Harpeth River at mile 46.7
treated domestic wastewater from Outfall 001 and drip irrigation of treated wastewater on field below the STP site
STEP collection system, RSF (0.05 MGD); 001 - UV & discharge or 002 - drip irrigation (0.036 MGD) (fenced)
4952
.05
15-AUG-2024 07:21AM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Notice of ViolationNOV for NON Compliance with permit parameters02-OCT-2024
Inspection ReportCEI drip field only27-SEP-2024
Inspection ReportCEI drip field only27-SEP-2024
Inspection ReportCEI drip field only follow up inspectoin27-SEP-2024
Letter24.0667 ER-PP Approval LTR 2024090606-SEP-2024
MemoWPN24.0554 ARP Memo 2024082323-AUG-2024
LetterNotice of Incomplete Application19-AUG-2024
ApplicationRCVD VIA EMAIL 19-JUL-24: cover letter, SOP app, drip narrative, maps, improvements schematic, existing drip schematic, and lease agreement by John Louallen19-JUL-2024
EmailDrip Repairs30-APR-2024
LetterResponse to NOV dated 28-MAR-2422-APR-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

03-JUL-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
02-JUL-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
11-JAN-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
18-OCT-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
19-JUN-2018Compliance Eval (non-sampling) (CEI)Immediately Corrected During Inspection
27-OCT-2016Compliance Eval (non-sampling) (CEI)In Compliance
04-SEP-2013Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
17-NOV-2011Compliance Eval (non-sampling) (CEI)NOV
25-JUN-2009Compliance Eval (non-sampling) (CEI)NOV
24-FEB-2006Compliance Eval (non-sampling) (CEI)NOV

Wastewater Engineering Plans Review

24.0667ApprovedPP-ERRGO8/24/269/5/2024Pegram Wastewater Treatment Facility Improvements
24.0554Review CompletePERRGO7/24/198/20/2024Pegram Wastewater Treatment Facility Improvements
22.0115ApprovedCDA. Bahour8/5/20228/5/2022The Farm at Cedar Valley
21.0811ApprovedCDA. Bahour12/6/202112/13/2021Evergreen Acres
15.0451ApprovedLINEMNU9/16/20159/17/2015Elkins Sewer Line Extension
98.0102ApprovedRECSFSPW2/3/19984/2/1998RCSF & INTERCEPTOR FM
24.0477Review CompletePPDTNH6/10/2024-Pegram WWTP Improvements
12.0247InactiveERA. Bahour5/21/2012-SRF Recirculating Sand Filter Drip Field and Process Improvements