Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5138AUB-Oostanaula Creek STP220 Alford StreetAthensMcMinnChattanooga

Permit Information

TN0024201
Individual
Reissuance
Athens Utilities Board (AUB)
Oostanuala STP
Treatment of municipal wastewater at the Oostanaula STP via extended aeration activated sludge with disinfecting by ultraviolet light
M
M
MW
04-APR-2022
04-APR-2022
16-AUG-2022
21-SEP-2022
01-NOV-2022
31-OCT-2027
Oostanaula Creek Mile 30.1
treated municipal wastewater from Outfall 001
Treated municipal wastewater from Outfall 001
4952
6
31-OCT-2024 10:35AM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB024201AUB Oostanaula Creek STP-BiosolidsExceptional QualityN/AChattanooga---
TNR056424Athens - Oostanaula Creek Wastewater Treatment Plant-TMSPActiveN/AChattanooga19-JUL-202020-JUL-202030-JUN-2025
TNR110371Athens Utilities Board-CGPInactiveN/AChattanooga---
  • 1 - 3 of 3

Permit Documents

View
LetterInitiation of Operation Notification for 6.0 MGD POTW23-FEB-2007
ReportAUB Semi Annual Progress Report January 200904-FEB-2009
ReportAUB Semi Annual Progress Report July 200916-JUL-2009
ReportAUB Semi Annual Progress Report January 201025-JAN-2010
ApplicationRenewal Application 201224-FEB-2012
LetterTCWN Comment on Draft Permit17-SEP-2012
LetterRCVD VIA EMAIL FROM JILL DAVIS 24-SEP-12: letter to Wade Murphy re: comments on Draft by unsigned.24-SEP-2012
EmailRCVD 26-SEP-12: email to Wade Murphy and Vojin Janjic re: nutrients by Connie Kagey.26-SEP-2012
Inspection ReportTechnical Assistance Visit April 201415-APR-2014
ReportAUB Semi-Annual Report 201427-OCT-2014
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:Overflows:WWTP OverloadCommissioner's OrderVerified with EFO and through a look at reported data in ICIS they are not under a moratorium. The orders that put them under a moratorium were issued in the 80's and 90s and are closed.Closed45

Inspections

26-APR-2024Pretreatment TAV and File ReviewIn Compliance
28-AUG-2023Sanitary Sewer SystemIn Compliance
08-MAR-2023Pretreatment Compliance (oversight)In Compliance
08-FEB-2022Pretreatment AuditIn Compliance
24-AUG-2021Compliance Eval (non-sampling) (CEI)In Compliance
11-FEB-2021Pretreatment TAV and File ReviewIn Compliance
23-JUN-2020Pretreatment Compliance (oversight)In Compliance
24-SEP-2019Compliance Eval (non-sampling) (CEI)In Compliance
11-MAR-2019Pretreatment TAV and File ReviewIn Compliance
27-MAR-2018Pretreatment Compliance (oversight)In Compliance

Wastewater Engineering Plans Review

24.0028ApprovedCDTNH1/9/20244/18/2024Minisystem 1 Phase 6 Grinder Pump Project
23.0074ApprovedCDMJB6/15/20236/15/2023Lonnie Hood - Co Rd 213 Subdivision - SEWER
23.0232ApprovedCDA. Bahour5/4/20235/31/2023Mini-System 1 Phase 5 Grinder Pump Project
23.0150ApprovedCDMJB3/20/20234/19/2023Davis Place
23.0055ApprovedCDA. Bahour1/30/20232/17/2023Co Rd 703 - 2" HDPE sewer Force Main Extension
22.0415ApprovedCDA. Bahour8/16/20229/12/2022E. Harper Johnson Area Pressurized Sewer Rehab
22.0172ApprovedCDTNH3/23/20224/11/2022Sanders Road 2" Sewer Force Main Extension
21.0317RReview CompleteCDTNH3/7/2022-SRF Athens Utility Board Sewer System Improvements Revised
21.0597ApprovedCDMJB8/3/20219/1/2021Sky Ridge Subdivision Sewer Extension (56 lots)
21.0487ApprovedCDMJB6/21/20217/13/2021Willet, Wilburn, & Shady Dr. LP SS Force Main Installation