Site IDSiteLocationCityCountyEFO Name
11847APAC Atlantic, Inc. Harrison Division / Knoxville Concrete1730 Transport LaneKnoxvilleKnoxKnoxville

Permit Information

TNG110289
RMCP
Active
Harrison Construction Company
APAC Atlantic Inc. Harrison Division/Knoxville Concrete
Ready Mix Concrete Plant
N/A
PW, SW
23-AUG-2023
31-JAN-2023
07-SEP-2023
07-SEP-2023
01-OCT-2023
31-OCT-2027
Woods Creek to Holston River from Outfalls 001/SW1
process wastewater from Outfall 001 and stormwater runoff from Outfall SW1
All process water is contained in a large concrete retention basin. Storm water is processed through a series of three retention ponds offsite.
3273
24-MAY-2024 03:14PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
ImageMap of impacted WWC13-SEP-2008
Topo MapMap of spill site and path of spill.13-SEP-2008
ImagePhoto of concrete matter in roadside ditch, Shumaker Road, taken by Woody Smith March 23, 2009.23-MAR-2009
ImagePhoto of concrete matter in roadside ditch, Shumaker Road, taken by Woody Smith March 23, 2009.23-MAR-2009
ImagePhoto of concrete matter in ditch near property taken by Woody Smith March 23, 2009.23-MAR-2009
ImagePhoto of concrete matter in roadside ditch, Shumaker Road, taken by Jason Mann March 23, 2009.23-MAR-2009
ImagePhoto of concrete matter in roadside ditch, Shumaker Road, taken by Jason Mann March 23, 2009.23-MAR-2009
ImagePhoto of concrete matter in ditch, Shumaker Road, taken by Jason Mann March 23, 2009.23-MAR-2009
ImagePhoto of lower settling pond, taken by Jason Mann, March 23, 2009. Solids and contaminated water were thrown out of pond during careless cleaning of pond.23-MAR-2009
Notice of ViolationNOV for placing material in a location where it is likely to enter waters of the state, RMCP permit violation.30-MAR-2009
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

17-JUN-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
29-APR-2022Compliance Eval (non-sampling) (CEI)In Compliance
09-JAN-2018Compliance Eval (non-sampling) (CEI)In Compliance
29-OCT-2013Compliance Eval (non-sampling) (CEI)In Compliance
24-MAR-2009Compliance Eval (non-sampling) (CEI)NOV
25-MAR-2009Follow-upNOV
23-MAR-2009SpillNOV
22-JUN-2011Stormwater Non-Construction Non-SamplingFollow-up Inspection Required