Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO NameGIS
181889Reece Sevier Property121 Blowing Cave RdSeviervilleSevierKnoxvilleView Map

Permit Information

NRS24.124b
ARAP
Construction of Intake and Outfall Structures
Active
Robby Reece
Reece - water intake
Excavation of 9 ft of less of the streambank perpendicular to stream flow will be necessary to create the designed spring development. Per design, a trench will be excavated approximately 2 feet greater than the channel depth and a minimum of 4 feet into the bank. Structure will then be lined with 8 oz. geotextile fabric with 24 inch or less diameter pipe installed in center of the structure to hold submersible pump which will feed farm watering system. Pipe will be backfilled with 2-3 inch stone to match existing bank elevation.
N/A
20-JUN-2024
26-JUN-2024
09-JUL-2024
18-JUL-2024
18-JUL-2024
07-APR-2025
Flat Creek
18-JUL-2024 11:46AM

Other DWR permits at this site

  • 1 - 1 of 1
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NRS24.124Robby ReeceReece - Stream CrossingsARAPActiveN/AKnoxville09-JUL-202409-JUL-202407-APR-2025
  • 1 - 1 of 1

Permit Documents

View
Emailnotice of coverage email 18-JUL-2024
Notice of Coverage (NOC)NRS24.124b NOC18-JUL-2024
AddendumARAP Payment09-JUL-2024
ApplicationApplication Package20-JUN-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

no data found