Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
4725ABB Installation Products, Inc.200 CHALLENGER DRPORTLANDSumnerNashville

Permit Information

NR2204.174
ARAP
Bank Armoring and Vegetative Stabilization
Active
ABB Installation Products, Inc.
Portland EPSC Project
Bank armoring and vegetative stabilization associated in Portland, Sumner County, Tennessee. The Project includes installing various erosion prevention and sediment control (EPSC) best management practices (BMPs) at multiple locations with excessive erosion at ABB’s existing manufacturing facility, including 74 linear feet (LF)of intermittent stream.
13-JUN-2022
13-JUN-2022
13-JUL-2022
13-JUL-2022
07-APR-2025
Summers Branch
01-JUN-2023 01:51PM

Other DWR permits at this site

  • 1 - 4 of 4
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR058260ABB Installation Products Inc.-TMSPActiveN/ANashville19-JUL-202020-JUL-202030-JUN-2025
TNR246358ABB Installation Products, Inc.ABB Installation Products, Inc.CGPInactiveN/ANashville-27-DEC-202230-SEP-2026
TEMP852Thomas & Betts Corp-TMSPNo ExposureN/ANashville---
TNR145560Thomas and Betts, Inc.-CGPInactiveN/ANashville-25-JUN-2007-
  • 1 - 4 of 4

Permit Documents

View
Notice of Coverage (NOC)NOC - NR2204.174 - Bank Stabilization (08-04-22)04-AUG-2022
ApplicationARAP13-JUN-2022
EmailSOS # required13-JUN-2022
ImageFee Paid10-JUN-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

no data found