Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
5744
Brownsville Energy Authority WWTP
170 W. Cooper St. (T.F.)
Brownsville
Haywood
Jackson
Permit Information
Permit Number
TN0062367
Permit Type
Individual
Status
Reissuance
Permittee Name
Brownsville Energy Authority
Project Name
Brownsville Wastewater Treatment - South Plant
Activity Description
Treatment of municipal wastewater from current trickling filter (1.08 MGD) with possible discharge from North Plant lagoon (0.95 MGD) through combined Outfall 001, and in the future discharge from only a sequencing batch reactor (SBR) of the same combined design capacity (2.03 MGD). The applicant determined this equipment replacement will not result in degradation of the receiving stream.
Permit Rating
M
Facility Classification
M
Discharge Code
MW
Application Received
08-JAN-2024
Application Returned
Application Complete
22-JAN-2024
Public Notice Date
04-JUN-2024
Issuance Date
16-JUL-2024
Effective Date
01-AUG-2024
Expiration Date
30-JUN-2029
Modification Date
16-DEC-2022
Termination Date
Receiving Stream
Hatchie River at mile 76.3
Effluent Description
Treated municipal wastewater currently from a trickling filter plant (1.08 MGD) and a separate lagoon treatment plant (0.95 MGD), both discharged through Outfall 001, and in the future only from a sequencing batch reactor (2.03 MGD) through Outfall 001.
Treatment Description
One plant features a trickling filter, primary and secondary clarification, and chlorination; the other features an aerated lagoon followed by a two-stage settling lagoon and chlorination.
SIC Code
4952
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
2.03
Record Last Updated
29-OCT-2024 07:55PM
Other DWR permits at this site
Go
Actions
1 - 5 of 5
Permit No
Permittee Name
Project Name
Permit Type
Status
Rating
EFO Name
__Issuance__
_Effective_
__Expiration__
NR1702.058
Brownsville Energy Authority
Sugar Creek Bank Stabilization
ARAP
Inactive
N/A
Jackson
-
06-DEC-2017
05-DEC-2019
NR1502.065
Brownsville Energy Authority
Brownsville 2015 CDBG Sewer System Improvements - Gravity Sewer Crossing of Sugar Creek
ARAP
Inactive
N/A
Jackson
30-OCT-2015
30-OCT-2015
28-OCT-2016
TNB062367
Brownsville STP
-
Biosolids
Inactive
N/A
Jackson
-
-
-
TNRX50172
Brownsville Wastewater Treatment Facility
-
TMSP
No Exposure
N/A
Jackson
-
-
-
NR1302.073
State of Tennessee-Dept. of General Services
Treated Wastewater Force Main - Memphis Regional Megasite
ARAP
Inactive
N/A
Jackson
06-NOV-2013
06-NOV-2013
30-JUN-2015
1 - 5 of 5
Column Actions
Search
Permit Documents
Search All Documents
View Permit
FileNet Documents
View
File Type
Description
Document Date
Email
PT Program Modification Approval PC LL, non-substantial, and approved limits
08-NOV-2024
Email
PT Narrative Conditions Reminder IWS TELL
30-SEP-2024
Spreadsheet
PT PTL Documents - Revised
22-JUL-2024
Letter
PT PTL Town Ltr - Revised
22-JUL-2024
Letter
2024 PCI Letter - Brownsville
18-JUL-2024
Inspection Report
2024 PCI Form - Brownsville
18-JUL-2024
Permit
Final NPDES Permit 2024
16-JUL-2024
Memo
Brownsville NPDES Certified Operator in Charge 2024
15-JUL-2024
Letter
RCVD VIA EMAIL 02-JUL-24: letter re: please recalculate low flow in Draft Permit by Scott Daniel of J.R. Wauford & Co.
02-JUL-2024
Draft Permit
Draft NPDES Permit 2024
04-JUN-2024
row(s) 1 - 10 of 215
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Moratorium
Problem
Mechanism
Result
Action Date
Status
Percent Annual I I
WWTP at Capacity
Previous order was closed on 9/6/13. It did not contain moratorium language.
9/6/2013
Watch List
55
Inspections
Inspection Date
Type
Result
09-JUL-2024
Pretreatment Compliance (oversight)
In Compliance
01-AUG-2023
Compliance Eval (non-sampling) (CEI)
In Compliance
27-JUL-2023
Pretreatment TAV and File Review
In Compliance
22-JUN-2022
Pretreatment Compliance (oversight)
In Compliance
24-AUG-2021
Compliance Eval (non-sampling) (CEI)
In Compliance
28-JUL-2021
Pretreatment Audit
In Compliance
28-AUG-2020
Pretreatment TAV and File Review
In Compliance
20-AUG-2019
Compliance Eval (non-sampling) (CEI)
In Compliance
13-AUG-2019
Pretreatment Compliance (oversight)
In Compliance
18-JUL-2018
Pretreatment TAV and File Review
In Compliance
row(s) 1 - 10 of 35
Next
Wastewater Engineering Plans Review
Project no
Plans Status
Type
Reviewer
Date Received
Approved Date
Project Name
03.0113
Approved
STDSPEC
Phil Simmo
2/10/2003
2/26/2003
STD SPECS
13.0279
Review Complete
PER
JMS
5/29/2013
7/3/2013
2013 CDBG - Brownsville WW Treatment Lagoon Improvement and Collection System I and I reduction
15.0139
Approved
CAP/ER
Phil Simmo
9/30/2010
6/10/2015
Brownsville CAP/ER
17.0155
Approved
LINE
MNU
2/23/2017
3/10/2017
Ind. Facility Development - Teknor Apex
19.0421
Approved
CD
AWJ
8/28/2019
8/28/2019
I-40 Advantage Industrial Park Sewer Improvements
22.0135
Approved
CD
MNU
3/28/2022
4/5/2022
Anderson Avenue Utility Extension
22.0648
Review Complete
PER
TNH
10/17/2022
11/4/2022
NPDES Permit TN0062367 Modification
22.0710
Approved
CD
CourtlandV
12/20/2022
1/3/2023
Arrowwood Subdivision
23.0164
Approved
CD
A. Bahour
3/22/2023
4/5/2023
Wendy's New Build, Oval Landing Subdivision - Lot 1; Brownsville, TN
23.0439
Approved
PP-ER
TNH
8/15/2023
9/19/2023
New Sequencing Batch Reactor Wastewater Treatment Plant
row(s) 1 - 10 of 14
Next