Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5136Shelbyville Power, Water & Sewerage System STP525 West Jackson StreetShelbyvilleBedfordColumbia

Permit Information

TN0024180
Individual
Reissuance
Shelbyville Power, Water & Sewerage System
Shelbyville STP
treatment of municipal sewage by activated sludge
M
M
MW
04-AUG-2023
29-AUG-2023
21-NOV-2023
27-DEC-2023
01-FEB-2024
31-JAN-2029
Duck River at mile 221.25
treated municipal wastewater from Outfall 001
Activated sludge treatment preceded by screening, grit removal, and primary clarification and followed by chlorination and step aeration. Sludge is thickened in aerobic digestors for land application or bed drying.
4952
6.5
22-OCT-2024 03:15PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR058858Shelbyville Power Water and Sewerage Wastewater Treatment Plant-TMSPNo ExposureN/AColumbia08-MAY-201408-MAY-201414-MAY-2014
TNB024180Shelbyville STP-BiosolidsActiveN/AColumbia09-DEC-201909-DEC-201915-AUG-2024
  • 1 - 2 of 2

Permit Documents

View
LetterTVA Flow Commitments for Normandy Dam at Shelbyville for WLA21-NOV-1991
LetterOperational Release Priorities for Normandy Dam (In consideration of new 6.5 MGD design)13-JUN-2005
ReportAntidegradation Justification for 6.5 MGD Design (Worksheets A and B)13-APR-2006
EmailBasis of Design Statement for 6.5 MGD Design05-FEB-2008
Environmental ReviewOutfall Plan for 6.5 MGD Design10-OCT-2008
LetterPT Audit Shelbyville 4/17/1230-MAY-2012
Form2012 CSI EPA Sept 18-SEP-2012
ReportDMR 28-FEB-1328-FEB-2013
Inspection Report2013 PCI June17-JUN-2013
Form2013 PCI Form June17-JUN-2013
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to the sewer manhole at Pickle Street 17-B due to more than 5 overflows within a 12 month period.12/7/2020Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to 1913 Wartrace Pike due to more than 5 overflows within a 12 month period.4/9/2024Active
Watch List50

Inspections

03-APR-2024Pretreatment TAV and File ReviewIn Compliance
06-DEC-2023Performance Audit (PAI)In Compliance
05-APR-2023Pretreatment Compliance (oversight)In Compliance
14-DEC-2022Compliance Sampling (CSI)In Compliance
15-JUN-2022Pretreatment AuditIn Compliance
15-DEC-2021Compliance Eval (non-sampling) (CEI)In Compliance
28-APR-2021Pretreatment TAV and File ReviewIn Compliance
04-JUN-2020Pretreatment Compliance (oversight)In Compliance
12-DEC-2019Compliance Eval (non-sampling) (CEI)In Compliance
25-SEP-2019Performance Audit (PAI)In Compliance

Wastewater Engineering Plans Review

24.0644ApprovedCDMJT8/20/20249/23/2024Stonegate Estates Phase 3
24.0399ApprovedCDMJT5/20/20248/3/2024MTSU Academic Facility Sewer Improvements
24.0355ApprovedCDRGO5/6/20245/15/2024Global Manor Phase 10
24.0354ApprovedCDRGO5/6/20245/15/2024Global Manor Phase 9
24.0322ApprovedCDRGO4/29/20245/3/2024Lucas Road Subdivision
24.0051Review CompletePERTNH1/23/20242/9/2024Little Hurricane Creek Sewer Rehab - ARP
23.0750ApprovedCDMJT11/30/20233/1/2024Bedford County Higher Education Center
23.0643ApprovedCDA. Bahour11/10/202312/8/2023Wheatfield Subdivision Phase 4
23.0649ApprovedCDJKM11/7/20231/2/2024D and D Subdivision Phase 3
23.0541ApprovedCDMJB11/1/202311/1/2023Global Manor Phase 6