Permit Information

TN0021539
Individual
Reissuance
Town of Alexandria
Alexandria STP
Treatment of municipal sewage via sequencing batch reactor with post treatment flow equalization and ultraviolet light disinfecting
I
M
MW
11-MAY-2022
25-JAN-2012
21-MAY-2022
28-JUN-2022
29-JUL-2022
01-AUG-2022
31-JUL-2027
Hickman Creek at mile 13.1
treated municipal wastewater from Outfall 001
Sequencing batch reactor (SBR) with post equalization and UV disinfection. Sludge is aerobically digested and dewatered for landfilling.
4952
.3
08-JUL-2024 03:41PM

Other DWR permits at this site

  • 1 - 1 of 1
  • 1 - 1 of 1

Permit Documents

View
Letter2015 Operator Form25-AUG-2015
Letter21.0213 Approval TDEC letter15-APR-2021
Memo22.0342 SRF Memo18-MAY-2022
FormAlexandria STP TN0021539, 3560, 6-21-13 CEI12-JUL-2013
ReportAlexandria STP TN0021539, 6-21-13 CEI12-JUL-2013
MemoAttendee List; Permit Appeal Informal Discussion; Town Hall; Alexandria11-OCT-2018
Notice of ViolationCEI NOV and CRM due to Bypass of Treatment; Operation and Maintenance, and Laboratory QA/QC13-APR-2023
LetterCEI Results14-JAN-2020
EmailCRM Follow-up Email16-SEP-2024
Notice of CRMCRM Sign In Sheet12-SEP-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

12-JUL-2024Compliance AssistanceOut of Compliance
30-MAR-2023Compliance Eval (non-sampling) (CEI)Out of Compliance
18-DEC-2019Compliance Eval (non-sampling) (CEI)In Compliance
08-JUL-2019Compliance AssistanceIn Compliance
19-JUN-2018Compliance Eval (non-sampling) (CEI)In Compliance
30-SEP-2016Compliance Eval (non-sampling) (CEI)In Compliance
21-JUN-2013Compliance Eval (non-sampling) (CEI)In Compliance
26-MAR-2012Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
08-JUN-2011Compliance Sampling (CSI)Minor Deficiency Noted
05-MAY-2010Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted

Wastewater Engineering Plans Review

24.0504PendingCDTNH6/28/20247/22/2024East High Street Sewer Lift Station Replacement
23.0411Pending-TNH8/4/2023-SRF 2021-456: Town of Alexandria WWTP Improvements
22.0291Review CompletePERTNH5/31/2022-SRF Alexandria Facilities Plan
22.0352Review CompletePPDTNH5/24/2022-Alexandria WWTP Improvements
21.0213ApprovedCDA. Bahour3/17/20214/15/2021Sewer Line Relocation for SR-26 Highway Project
15.0388Approved-MNU6/19/20157/31/2015Proposed East Main Street Sewer Force Main
08.0671ApprovedIMPJMS7/1/20088/4/2008Contract B - Sewer System Repair (CDBG)