Site IDSiteLocationCityCountyEFO Name
5070CITGO Petroleum Corporation2409 Knott RoadKnoxvilleKnoxKnoxville

Permit Information

TN0022411
Individual
Reissuance
CITGO Petroleum Corporation
Knoxville Petroleum Bulk Station and Terminal
Treatment of industrial stormwater and rack wash water at a bulk petroleum storage marketing terminal via oil/water separators and air stripper on an as-need basis.
I
X
PW, SW
13-OCT-2021
25-OCT-2021
01-MAR-2022
04-APR-2022
01-MAY-2022
30-APR-2027
Unnamed tributary at mile 0.5 to Third Creek at mile 5.3 which routes to Fort Loudoun Reservoir at Tennessee River mile 645.9
Treated and untreated storm water runoff and treated rack wash water through Outfall 001
oil/water separator and a 20,000 gallon holding tank
5171
.042
07-SEP-2023 01:49PM

Other DWR permits at this site

  • 1 - 1 of 1
  • 1 - 1 of 1

Permit Documents

View
EmailSENT 07-SEP-12: email re: hydrostatic testing by Bob Alexander.07-SEP-2012
Old PermitSENT 05-NOV-12: Old Final by Bob Alexander.05-NOV-2012
FormSignatory Authority16-JAN-2013
Old PermitRevised to replace SWPPP with BMP03-JUL-2013
LetterCEI Report & ICIS Form10-JUN-2014
Inspection ReportCitgo 2016 CEI Report & ICIS Form05-OCT-2016
ApplicationRCVD 30-MAY-17: NPDES app by Mike Abba.30-MAY-2017
LetterNotice of Complete Application June 201720-JUN-2017
Draft PermitDraft Permit 201814-MAR-2018
Old PermitFinal Permit 201818-APR-2018
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

26-JAN-2023Compliance Eval (non-sampling) (CEI)In Compliance
25-JUN-2020Compliance Eval (non-sampling) (CEI)In Compliance
04-SEP-2018Compliance Eval (non-sampling) (CEI)In Compliance
27-SEP-2016Compliance Eval (non-sampling) (CEI)In Compliance
04-JUN-2014Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

no data found