Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5006Newport STP465 Lisega Blvd. (mailing P.O. Box 519, Newport, TN 37822)NewportCockeKnoxville

Permit Information

TN0020702
Individual
Reissuance
City of Newport
Newport STP
Equalization, blending/selector system, activated sludge, ammonia/nitrogen removal, filtration, chlorination, dechlorination, and reaeration
M
M
MW
09-OCT-2024
01-NOV-2024
18-FEB-2020
01-APR-2020
01-MAY-2020
31-MAR-2025
Pigeon River Mile 4.0
treated municipal wastewater from Outfall 001
equalization, activated sludge, ammonia stripping, filtration, chlorination, reaeration, aerobic sludge digestion, belt press dewatering, sludge drying
4952
4.35
06-JAN-2025 08:25PM

Other DWR permits at this site

Permit Documents

View
ReportREF 13-NOV-79: effluent limits by unsigned w/ 08-Dec-87 plant expansion report by Jeanne Wilson of City of Newport.13-NOV-1979
ReportREF 07-APR-88: report re: submerged multiport diffuser by Frank Tatom of Engineering Analysis Inc.07-APR-1988
LetterREF 01-JUN-88: letter to Tom Dziubakowski re: preliminary design of diffuser by Jurek Patoczka of Aware Inc.01-JUN-1988
MemoREF 01-JUN-88: memo re: TDS mass balance by Jurek Patoczka of Aware Inc.01-JUN-1988
LetterREF 02-JUN-88: letter to Carrol Proffitt re: results of pilot plant investigation by Jurek Patoczka of Aware Inc.02-JUN-1988
LetterREF 03-JUN-88: letter to Earl Leming re: indirect discharge by T.J. Dziubakowski.03-JUN-1988
FormForm31-JUL-2009
LetterLetter31-JUL-2009
LetterTN0020702 NOIA28-JAN-2010
LetterPCI/10623-APR-2010
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

10-DEC-2024Pretreatment Compliance (oversight)In Compliance
19-MAR-2024Pretreatment TAV and File ReviewIn Compliance
05-OCT-2023Compliance Eval (non-sampling) (CEI)In Compliance
04-JAN-2023Pretreatment Compliance (oversight)In Compliance
18-AUG-2022Pretreatment AuditIn Compliance
09-MAR-2022Compliance Eval (non-sampling) (CEI)In Compliance
11-JAN-2021Pretreatment TAV and File ReviewIn Compliance
08-OCT-2020Compliance Eval (non-sampling) (CEI)In Compliance
18-MAR-2020Pretreatment Compliance (oversight)In Compliance
22-MAY-2019Pretreatment TAV and File ReviewIn Compliance

Wastewater Engineering Plans Review

24.0661Pending-TNH8/23/20249/25/2024Newport Utilities Standard Specifications
24.0421PendingPERTNH5/28/20246/24/2024PER - Interstate-40 Sanitary Sewer Extension
24.0046PendingCDMJB1/22/20244/29/2024Thinwood Drive Low Pressure Sewer Pump Station and Force Main
23.0116PendingCDMJB3/1/20236/15/2023INDUSTRIAL ROAD PUMP STATION AND FORCE MAIN IMPROVEMENTS
23.0052PendingCDTNH1/26/20232/10/2023NEWPORT UTILITIES SR 25-70 PUMP STATION AND FORCE MAIN
23.0016PendingCDCourtlandV1/9/20233/31/202324-In Gravity Sewer Improvements
22.0606Pending-TNH9/23/2022-State Route 25-70 Pump Station And Force Main
22.0557PendingCDTNH8/29/20229/30/2022Newport Wastewater Treatment Plant - Plant Drainage Lift Station Replacement
21.0522ApprovedCDTNH10/8/202110/20/2021Rankin Hill Road
20.0681ApprovedCDTNH1/11/20211/12/2021Incredible Tiny Homes - The Beach & Prairie