Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
10987
City of Knoxville Municipal Separate Storm Drain System
Room 480 400 Main St
Knoxville
Knox
Knoxville
Permit Information
Permit Number
IWTOLD001
Permit Type
IWT
Status
New
Permittee Name
Knoxville Utility Board
Project Name
Activity Description
From the Upper Tennessee River watershed to Holston River watershed: 5.12 million gallons per day (MGD) through the Loves Creek STP and 0.095 MGD through the Eastbridge STP; and 0.332 MGD to the French Broad through the Shady Grove PS.
Permit Rating
Facility Classification
Discharge Code
Application Received
23-JUL-2007
Application Returned
Application Complete
Public Notice Date
Issuance Date
Effective Date
Expiration Date
Modification Date
Termination Date
Receiving Stream
1. Holston River/Watauga River watershed; 5.12 million gallons per day (MGD) from the Martin B. Whitaker Water Treatment Plant located in the Upper Tennessee River/Clinch River/Emory River watershed is discharged through the Loves Creek Sewage Treatment Plant (STP) which is located in the Holston River/Watauga River watershed; 2. 0.095 MGD from the Martin B. Whitaker Water Treatment Plant located in the Upper Tennessee River/Clinch River/Emory River watershed is discharged through the Eastbridge STP which is located in the Holston River/Watauga River watershed; 3. 0.332 MGD from the Martin B. Whitaker Water Treatment Plant which is located in the Upper Tennessee River/Clinch River/Emory River watershed to the Shady Grove PS which is located in the Holston River/Watauga River waters
Effluent Description
1. Holston River/Watauga River watershed; 5.12 million gallons per day (MGD) from the Martin B. Whitaker Water Treatment Plant located in the Upper Tennessee River/Clinch River/Emory River watershed is discharged through the Loves Creek Sewage Treatment Plant (STP) which is located in the Holston River/Watauga River watershed; 2. 0.095 MGD from the Martin B. Whitaker Water Treatment Plant located in the Upper Tennessee River/Clinch River/Emory River watershed is discharged through the Eastbridge STP which is located in the Holston River/Watauga River watershed; 3. 0.332 MGD from the Martin B. Whitaker Water Treatment Plant which is located in the Upper Tennessee River/Clinch River/Emory River watershed to the Shady Grove PS which is located in the Holston River/Watauga River waters
Treatment Description
Upper Tennessee River/Clinch River/Emory River watershed is discharged through the Loves Creek Sewage Treatment Plant (STP) which is located in the Holston River/Watauga River watershed;
SIC Code
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
Record Last Updated
26-JAN-2024 11:06AM
Other DWR permits at this site
Go
Actions
1 - 1 of 1
Permit No
Permittee Name
Project Name
Permit Type
Status
Rating
EFO Name
__Issuance__
_Effective_
__Expiration__
TNS068055
City of Knoxville
MS4 and QLP
MS4
Reissuance
N/A
Knoxville
30-JUN-2004
01-JUL-2004
30-JUN-2009
1 - 1 of 1
Column Actions
Search
Permit Documents
Search All Documents
FileNet Documents
View
File Type
Description
Document Date
Letter
2015 - 2016 Annual report
23-SEP-2016
Letter
2016 - 2017 annual report
27-SEP-2017
Report
2019-20 Annual Report KUB
18-SEP-2020
Report
2020-2021 Annual Report
28-SEP-2021
Report
2021-2022 Annual
29-SEP-2022
Report
Inter-basin Water Transfer Report
01-OCT-2020
Letter
RCVD 01-OCT-12: letter to Jim McAdoo re: annual report by Debbie Ailey.
01-OCT-2012
Letter
RCVD 02-NOV-15: letter to Jim McAdoo re: annual report by Debbie Ailey.
02-NOV-2015
Letter
RCVD 03-OCT-23: letter re: annual report by Kevin Keaton
03-OCT-2023
Report
RCVD 16-SEP-24: report re: transfer from the Tennessee River to Holston River; and from the Tennessee River to French Broad River. July 2023 thru June 2024 by Kevin Keaton
16-SEP-2024
row(s) 1 - 10 of 13
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Inspections
no data found