Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5538Oneida STP1690 O&W RoadOneidaScottKnoxville

Permit Information

TN0064424
Individual
Reissuance
Town of Oneida
Oneida STP
Treatment of municipal sewage via oxidation ditch followed by chlorination, de-chlorination and cascade-aeration
I
M
MW
22-APR-2024
19-APR-2024
23-APR-2024
30-APR-2024
10-JUN-2024
01-SEP-2024
31-AUG-2029
Pine Creek at mile 7.2
treated municipal wastewater from Outfall 001
Oxidation ditch preceded by screening and grit removal and followed by chlorine disinfecting and cascade aeration. Sludge is dewatered on beds using polymers.
4952
.98
08-JUL-2024 03:41PM

Other DWR permits at this site

Permit Documents

View
ApplicationRCVD 23-JUN-14: NPDES app by Jack Lay.23-JUN-2014
EmailREF 27-JUN-14: email re: app acknowledgment w/ notes by Wade Murphy.27-JUN-2014
LetterComplete Application Notification15-JUL-2014
ApplicationIndividual effluent sampling results for silver25-NOV-2014
Draft Permitdraft permit, proposes silver limit and total nitrogen limit16-DEC-2014
LetterRCVD 08-JAN-15: letter to Vojin Janjic re: comments on Draft by Jack Lay of Town of Oneida.08-JAN-2015
LetterRCVD VIA EMAIL 12-JAN-15: letter to Wade Murphy re: comments on Draft by Dana Wright of TCWN.12-JAN-2015
EmailExtension of comment period; Provided follow up to telephone call regarding plant optimization expectations02-FEB-2015
LetterApplicant Comment on Draft Permit Terms and Conditions18-FEB-2015
LetterEVALUATION OF DRAFT NPDES PERMIT (64424) LIMITS FOR ONEIDA, TN, FEBRUARY, 201518-FEB-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetter3/25/2019Active59

Inspections

12-DEC-2006Reconnaissance (RI)In Compliance
10-SEP-2008Pretreatment AuditNOV
23-SEP-2009Pretreatment Compliance (oversight)In Compliance
22-FEB-2010Compliance Biomonitoring (CBI)In Compliance
26-MAY-2010Pretreatment TAV and File ReviewIn Compliance
30-APR-2012Pretreatment TAV and File ReviewIn Compliance
28-MAR-2013Compliance Eval (non-sampling) (CEI)Follow-up Inspection Required
04-APR-2013Compliance Eval (non-sampling) (CEI)Follow-up Inspection Required
30-JUN-2013Pretreatment AuditNotice of Deficiency
23-APR-2014Pretreatment Compliance (oversight)Minor Deficiency Noted

Wastewater Engineering Plans Review

24.0214Approved-MJB3/24/267/12/2024Oneida Standard Sewer Specifications
23.0784ApprovedCDMJT12/13/20232/12/20242022 Sanitary Sewer Rehabilitation
22.0100ApprovedCDShannon Mc2/24/20223/4/2022Oneida 2021 ARC Sanitary Sewer Rehabilitation
21.0041ApprovedCDTNH2/10/20212/24/2021Bear Creek Road Apartments Sewer Line Extension
20.0760ApprovedCDRGO12/17/20201/3/20212020 ARC Sanitary Sewer Rehabilitation
20.0082ApprovedCDA. Bahour3/18/20203/18/2020Oneida Relocation
18.0360ApprovedSTPUPGRWDM5/31/20186/7/20182017 Wastewater Treatment Plant Modifications
16.0419ApprovedSTPUPGRWDM5/31/20166/14/20162015 CDBG WWTP
04.0081ApprovedSTDSPECPhil Simmo1/26/20041/26/2004STD SPECS