5059Portland STP124 Morningside DrivePortlandSumnerNashville

Permit Information

TN0021865
Individual
Modification
City of Portland
Portland STP
Upgrading the treatment systems by adding 2 SBRs for a total of 4 SBRs to increase the capacity from 1.9 to 2.85 MGD. The new design will not increase loads of oxygen demanding pollutants and incidental degradation is justified by the applicant.
M
M
MW
27-APR-2021
20-JUN-2019
06-AUG-2019
01-DEC-2019
01-JAN-2020
31-AUG-2024
Summers Branch at mile 8.6 to the Red River
treated municipal wastewater from Outfall 001
Sequencing Batch Reactor (SBR) activated sludge with chlorination, dechlorination, and post aeration. Sludge: was, imhoff, to land appl.
4952
2.85
05-JUN-2024 07:40AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR246722City of Portland, Tennessee2020 Wastewater Treatment Plant ExpansionCGPActiveN/ANashville-10-JUL-202330-SEP-2026
TNB021865Portland STP-BiosolidsIncompleteN/ANashville---
  • 1 - 2 of 2

Permit Documents

View
Letter24.0227 Approval letter 2024053030-MAY-2024
Letter24.0289 Approval letter 2024052323-MAY-2024
Letter24.0325 Plans Approval LTR 2024052020-MAY-2024
LetterWPN 24.0148 Approval Letter03-MAY-2024
LetterWPN24.0160 Approval Letter 2024040101-APR-2024
EmailRCVD 26-MAR-24: email re: response to Notice of Application Due from Bryan Price26-MAR-2024
LetterWPN23.0747 Approval Letter 2024032626-MAR-2024
LetterPT Delegated Signatory21-MAR-2024
EmailResponse to resignation notice. Informing Portland they have 30 days to secure a new certified operator.11-MAR-2024
EmailNotice of resignation of chief operator for Portland STP.11-MAR-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:Permit ViolationsCommissioner's OrderMoratorium on Connections see Item 8 under Order & Assessment Section (page 15).4/18/2017Active58

Inspections

17-JUN-2024Compliance Eval (non-sampling) (CEI)Pending
14-JUN-2023Pretreatment TAV and File ReviewIn Compliance
18-AUG-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JUL-2022Sanitary Sewer SystemIn Compliance
02-JUN-2022Pretreatment Compliance (oversight)In Compliance
25-MAY-2021Pretreatment AuditOut of Compliance
03-MAR-2021Follow-upOut of Compliance
07-JUL-2020Compliance Eval (non-sampling) (CEI)Out of Compliance
01-JUL-2020Sanitary Sewer Overflow Non-SamplingOut of Compliance
11-JUL-2019Pretreatment Compliance (oversight)Out of Compliance

Wastewater Engineering Plans Review

19.0252Review CompleteC&E ReviewSJH4/30/2019-Portland 2018 Annual CMOM Report
24.0325ApprovedCDRGO4/30/20245/20/2024Bracken Estates - Sanitary Sewer Plans
24.0289ApprovedCDMJB5/23/20245/23/2024Parkside Pointe SPS & Force main
24.0227ApprovedCDMJB4/1/20245/30/2024Parkside Pointe
24.0160ApprovedCDMJT3/1/20244/1/2024Sanitary Sewer Rehab of Portland Sudden Service
24.0148ApprovedCDJKM2/27/20245/3/2024Harbin Sandye Avenue - Sanitary Sewer Collection Plans
24.0015ApprovedCDTNH2/2/20242/5/2024N Harris Ln Sewer Extension
23.0747ApprovedCDTNH3/1/20243/26/2024HWY 52E No. 1 Lift Station Relocation
23.0629ApprovedCDTNH1/29/20241/29/2024Twin Lakes
23.0560ApprovedCDJKM2/26/20242/28/2024Richland Estates Subdivision – Sanitary Sewer Collection Plans