Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
4912Smyrna STP100 Jack Hunter DriveSmyrnaRutherfordNashville

Permit Information

TN0020541
Individual
Reissuance
Town of Smyrna
Smyrna STP
Discharge of treated municipal wastewater by aerated activated sludge plant with UV disinfection; Reissuance imposes limits for existing 5.85 MGD facility as well as proposed increase to 9.0 MGD. The applicant will maintain existing loads to minimize degradation with incidental degradation justified by social and economic benefit.
M
M
MW
11-AUG-2021
11-AUG-2021
12-AUG-2021
14-SEP-2021
19-OCT-2021
01-DEC-2021
30-NOV-2026
30-SEP-2009
Stewart Creek at mile 5.65
treated municipal wastewater from Outfall 001 and distribution of treated municipal wastewater for non-potable reuse in irrigation.
Aerated activated sludge plant with UV disinfection. Reuse water system to go on line 6/2011. WAS to thickner to aerob dig to belt press to landfill.
4952
5.85
08-JUL-2024 03:49PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB020541Smyrna STP-BiosolidsActiveN/ANashville08-JAN-202008-JAN-202015-AUG-2024
TNR242658Town of Smyrna2018 Wastewater Treatment Plant ExpansionCGPInactiveN/ANashville-25-JUN-201830-SEP-2026
  • 1 - 2 of 2

Permit Documents

View
Letter24.0764 Plans Approval LTR 2024101414-OCT-2024
Letter24.0761 Plans Approval LTR 2024101414-OCT-2024
LetterWPN 22.0665 Extension Letter 10.02.202402-OCT-2024
Letter24.0683 Plans Approval LTR 2024092424-SEP-2024
LetterWPN24.0618 Approval Letter 2024091717-SEP-2024
Letter24.0633 Approval letter 2024091616-SEP-2024
LetterWPN24.0255 Approval Letter 2024090405-SEP-2024
LetterWPN24.0256 Approval Letter 2024090405-SEP-2024
Letter24.0272 Approval letter 2024080202-AUG-2024
Letter24.0582 Plans Approval LTR 2024073131-JUL-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

29-JAN-2007Compliance Biomonitoring (CBI)Notice of Deficiency
29-MAR-2007Pretreatment Compliance (oversight)In Compliance
13-MAR-2008Pretreatment TAV and File ReviewIn Compliance
12-MAR-2009Pretreatment Compliance (oversight)Minor Deficiency Noted
29-OCT-2009Pretreatment TAV and File ReviewIn Compliance
12-OCT-2010Pretreatment AuditMinor Deficiency Noted
16-JUN-2011Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
01-DEC-2011Pretreatment Compliance (oversight)Minor Deficiency Noted
14-AUG-2012Performance Audit (PAI)Minor Deficiency Noted
16-OCT-2012Pretreatment TAV and File ReviewIn Compliance

Wastewater Engineering Plans Review

24.0764Inactive-RGO10/24/210/14/2024Hidden Hills Sec 6, Ph 2A Sewer
24.0761InactiveCDRGO10/24/110/14/2024Courtyard at Stewarts Creek, Phase 3
24.0683InactiveCDRGO9/24/39/24/2024Hidden Springs Sewer
24.0618ApprovedCDTNH8/10/20249/17/2024Basin A Sewer Rehabilitation Phase 2
24.0633ApprovedCDMJB9/13/20249/16/2024Villagewood Sewer
24.0256ApprovedCDMJT4/5/20249/4/2024NEWBERRY OFFSITE SEWER
24.0255ApprovedCDMJT4/24/59/4/2024NEWBERRY SEWER
24.0582InactiveCDRGO7/24/267/31/2024Sewart's Landing Roadway Sewer
24.0272ApprovedCDMJB4/24/107/31/2024Briley Downs Sewer
24.0491ApprovedCDMJT6/21/20247/26/2024Greystone Sewer, Phase 1B, Section 2