Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5174Manchester Water and Sewer Department736 West High StreetManchesterCoffeeColumbia

Permit Information

TN0025038
Individual
Reissuance
City of Manchester
Municipal POTW
Treatment of municipal sewage by extended aeration activated sludge (oxidation ditch) and UV disinfecting
M
M
MW
27-JUL-2023
19-JUL-2023
27-JUL-2023
05-DEC-2023
09-FEB-2024
01-MAR-2024
28-FEB-2029
Duck River at mile 268.5
treated municipal wastewater from Outfall 001
Oxidation ditch treatment with chlorine disinfection and dechlorination. Sludge is aerobically digested for land application.
4952
4.3
29-OCT-2024 12:20PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB025038Manchester STP-BiosolidsReissuanceN/AColumbia25-JUL-201425-JUL-201430-APR-2019
TNR181153Manchester Water and Sewer DepartmentWastewater Treatment Plant ImprovementsCGPInactiveN/AColumbia-23-NOV-2009-
  • 1 - 2 of 2

Permit Documents

View
Letterrevised PTLs10-DEC-2018
Draft Permitdraft permit 201830-NOV-2018
Draft Permitdraft permit23-JUN-2014
MemoWPN23.0760 ARP Memo 2024010202-JAN-2024
LetterWPN23.0608 Approval Letter 2024080808-AUG-2024
SpreadsheetWPN 21.0438 - Example De minimis Calculation Spreadsheets for Planning Purposes25-JUN-2021
EmailWPN 20.0558 Email Incomplete 2020101212-OCT-2020
LetterWPN 20.0558 Approval Letter27-OCT-2020
118a Formal ComplaintUpdated Formal Complaint08-APR-2024
ApplicationUpdate to Alternatives Analysis - Supplemental Application Information05-SEP-2013
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole A43.4/30/2024Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole A39.4/30/2024Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole B49.10/2/2024Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole I141A.5/7/2024Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole B43.5/16/2024Active
I/IPermitorder closed--reverts to permit conditions4/4/2024Watch List75

Inspections

29-MAR-2024Performance Audit (PAI)In Compliance
05-MAR-2024Pretreatment TAV and File ReviewOut of Compliance
17-MAR-2023Compliance Biomonitoring (CBI)In Compliance
21-FEB-2023Pretreatment Compliance (oversight)Out of Compliance
24-FEB-2022Pretreatment TAV and File ReviewIn Compliance
23-FEB-2022Compliance Eval (non-sampling) (CEI)In Compliance
10-MAR-2021Compliance Eval (non-sampling) (CEI)In Compliance
23-FEB-2021Pretreatment Compliance (oversight)In Compliance
11-FEB-2020Pretreatment AuditOut of Compliance
27-FEB-2019Compliance Sampling (CSI)In Compliance

Wastewater Engineering Plans Review

23.0608ApprovedCDTNH8/6/20248/8/2024Basins A, B, E, F, H, I, & K Sewer Rehabilitation
24.0395ApprovedCDRGO5/19/20245/21/2024Laurel View Residential Subdivision
23.0760Review CompletePERTNH12/5/20231/2/20242022 ARP Sewer Rehabilitation Project
23.0373ApprovedCDMJB8/21/20238/22/2023Haley Drive Townhomes
23.0247ApprovedCDMJB5/15/20236/1/2023Stonehenge Residential Development (158 lots)
23.0080ApprovedCDA. Bahour5/15/20235/16/2023Manchester Water and Sewer Standard Specifications
23.0211Incomplete-MJB4/20/2023-Manchester Pointe Townhomes
23.0065ApprovedCDMJB4/20/20234/28/2023Simply Southern Residential Subdivision (76 lots)
22.0528ApprovedCDA. Bahour8/17/20229/13/2022MWSD 2022 Sewer Repairs
18.0273R3ApprovedCDA. Bahour7/28/20227/29/2022Basins E, F, H, I, & M Sewer Rehabilitation-Revised