Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5058Winchester WWTP448 Utility DriveWinchesterFranklinColumbia

Permit Information

TN0021857
Individual
Reissuance
Winchester Utility System
Winchester WWTP
Treatment of municipal sewage via oxidation ditch and UV disinfection
M
M
MW
29-APR-2022
13-MAY-2022
18-OCT-2022
21-NOV-2022
01-JAN-2023
31-DEC-2027
Tims Ford Reservoir (RM 154) near confluence of Elk River and Boiling Fork
treated domestic wastewater from Outfall 001
oxidation ditch followed by clarification, UV disinfection, and stair step aeration
4952
3.2
15-OCT-2024 08:45AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NR1108.2424City of Winchester Utilities-ARAPInactiveN/AColumbia01-AUG-201103-AUG-201130-JUN-2015
TNB021857Winchester STP-BiosolidsInactiveN/AColumbia---
  • 1 - 2 of 2

Permit Documents

View
Letter24.0676 Plans Approval LTR 2024091818-SEP-2024
Letter24.0688 Approval letter 2024091717-SEP-2024
FormPT Audit Forms05-SEP-2024
LetterPT Audit Letter05-SEP-2024
Notice of ViolationPT SAR NOV09-JUL-2024
Letter2024 Operator In Charge July01-JUL-2024
LetterWPN24.0177 Approval Letter 2024051717-MAY-2024
LetterWPN24.0176 Approval Letter 2024041212-APR-2024
Letter2023 Operator in Charge July10-JUL-2023
Inspection Report2023 TAV May25-MAY-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetter23-APR-20 Self-imposed moratorium on connections that ultimately flow to the Belvidere Lift Station for more than five overflows. 31-Jul-20 Granted relief from moratorium after additional information was submitted.7/31/2020Closed
OverflowsLetterNotify EFO Prior to Beginning Plans App.8/26/2010Closed41
Watch List41

Inspections

13-AUG-2024Pretreatment AuditIn Compliance
23-MAY-2023Pretreatment TAV and File ReviewIn Compliance
17-MAR-2023Compliance Biomonitoring (CBI)In Compliance
10-AUG-2022Compliance Sampling (CSI)In Compliance
17-MAY-2022Pretreatment Compliance (oversight)In Compliance
18-AUG-2021Performance Audit (PAI)In Compliance
05-MAY-2021Pretreatment TAV and File ReviewIn Compliance
05-MAY-2020Pretreatment Compliance (oversight)In Compliance
16-JUL-2019Compliance Eval (non-sampling) (CEI)In Compliance
06-FEB-2019Pretreatment AuditIn Compliance

Wastewater Engineering Plans Review

24.0676InactiveCDRGO8/24/299/18/2024Deer Valley Residential Subdivision
24.0668Approved-MJB9/6/20249/17/2024Winchester Standard Sewer Specifications
24.0398Review CompletePERMJT5/8/20245/21/2024Mountainview Lift Station Modifications and Bible Crossing Forcemain
24.0177ApprovedCDMJT3/7/20245/17/2024Bible Crossing Road Force Main
24.0176ApprovedCDMJT3/7/20244/12/2024Mountainview Lift Station Modifications
21.0478RApprovedCDTNH11/29/202111/30/2021Twin Creeks Phase 13
21.0639ApprovedCDA. Bahour9/15/20219/16/2021Shadowbrook Pump Station Modifications
21.0478ApprovedCDMNU6/16/20217/14/2021Twin Creeks Phase 13
21.0112ApprovedCDMNU2/8/20213/4/2021Fire Hall Sewer Extension
20.0297ApprovedCDA. Bahour5/29/20205/29/2020Sharp Springs Estates