Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5255City of Lebanon Gasification Plant dba Lebanon Waste Water Treatment Plant321 Hartmann DriveLebanonWilsonNashville

Permit Information

TN0028754
Individual
Reissuance
City of Lebanon
Lebanon POTW
Treatment of municipal sewage by conventional activated sludge preceded by flow equalization, mechanical screening and grit removal and followed by ultraviolet disinfection.
M
M
MW, RU
19-DEC-2023
16-JAN-2024
16-APR-2024
24-JUN-2024
01-AUG-2024
31-MAY-2029
Cumberland River (Old Hickory Reservoir) at mile 252.2
treated municipal wastewater from Outfall 001
4952
10
08-JUL-2024 03:49PM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR146287City of Lebanon, Dept. of Public Works-CGPInactiveN/ANashville-22-APR-2008-
NR1804.078City of Lebanon, Dept. of Public WorksBlaire Lane Sewer UpsizeARAPInactiveN/ANashville-10-MAY-201806-APR-2020
TNB028754Lebanon STP-BiosolidsActiveN/ANashville15-APR-202015-APR-202015-AUG-2024
  • 1 - 3 of 3

Permit Documents

View
ReportLebanon-WWAWC Service Area Agreement with stipulations for sharing Outfall 00101-JUL-2014
ReportOCT 2014 PT SAR29-OCT-2014
FormRCVD 08-JAN-15: form re: ck# 00125870 for $1380.08-JAN-2015
Inspection Report15-JAN-15 PCI form30-JAN-2015
Notice of Violation15-JAN-15 PCI NOV30-JAN-2015
LetterCity of Lebanon Pass Through LImits20-FEB-2015
Green CardCity of Lebanon Pass Through LImits Green Card 7009282000036029590023-FEB-2015
ReportOverflow report23-FEB-2015
Letterreply to 30-JAN-15 NOV27-FEB-2015
LetterLebanon Local Limit evaluation30-MAR-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/ILetterSelf Imposed Moratorium, Spoke with Regina Santana at the city. The facility has been allowed to add to collection system at a rate based on the reduction in flow as a result of rehabilitation work. The main plant was also expanded. - JAH 3/4/2016 The facility submitted in May 2016 the 2015 status report which stated that they did not have five overflows in the same location since 2011. The order was closed officially on 15-SEP-16. The city is not on a moratorium. JAH 9/22/2016 9/22/2016Watch List66

Inspections

30-JUN-2024Compliance AssistanceIn Compliance
09-FEB-2024Compliance Biomonitoring (CBI)In Compliance
25-JAN-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
30-JAN-2020Compliance Eval (non-sampling) (CEI)Out of Compliance
30-NOV-2017Compliance Eval (non-sampling) (CEI)In Compliance
18-AUG-2016Compliance Eval (non-sampling) (CEI)In Compliance
28-AUG-2014Compliance Eval (non-sampling) (CEI)NOV
27-JUN-2012Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
01-DEC-2006Compliance Eval (non-sampling) (CEI)In Compliance
09-FEB-2024Performance Audit (PAI)In Compliance

Wastewater Engineering Plans Review

24.0508ApprovedCDRGO7/2/20247/9/2024Project Soaring Eagle Sewer
24.0487IncompleteCDMJB6/21/2024-HWY 109 Warehouses Public Sanitary Sewer
24.0343PendingCDMJB6/7/2024-Farmington Woods Pump Station Abandonment
24.0285ApprovedCDRGO4/16/20244/21/2024DZ INVESTMENTS- SEWER EXTENSION
24.0262ApprovedCDMJB4/8/20245/24/2024Madison @ Township
24.0216ApprovedCDMJB5/6/20245/7/2024Bartons Mill Subdivision
24.0153ApprovedCDRGO2/28/20243/12/2024Lot 3, Hartmann Central - Sewer Extension
24.0133InactiveCDMJB2/20/2024-Woodbridge Glen Phase 3 Townhomes
24.0127ApprovedCDJKM5/13/20246/12/2024MANOR VIEW, SECTION 3 (SEWER)
24.0039ApprovedCDTNH1/17/20241/31/2024Cedartree Roadway & Infrastructure Plan