Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5059Portland STP124 Morningside DrivePortlandSumnerNashville

Permit Information

TN0021865
Individual
Reissuance
City of Portland
Portland STP
Treatment of municipal sewage via two sequencing batch reactors (1.9 MGD) and three sequencing batch reactors in Fall 2024 (2.85 MGD) with chlorine disinfecting and dechlorination. The permittee will meet more stringent effluent limits to maintain formerly permitted loads with expanded treatment capacity. Residual biosolids are digested and land applied on approximately 400 acres.
M
M
MW
09-JUL-2024
03-JUL-2024
10-JUL-2019
16-JUL-2024
01-DEC-2019
01-JAN-2020
31-AUG-2024
Summers Branch at mile 8.6 to the Red River
treated municipal wastewater from Outfall 001
Sequencing Batch Reactor (SBR) activated sludge with chlorination, dechlorination, and post aeration. Sludge: was, imhoff, to land appl.
4952
2.85
16-JUL-2024 11:35AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR246722City of Portland, Tennessee2020 Wastewater Treatment Plant ExpansionCGPActiveN/ANashville-10-JUL-202330-SEP-2026
TNB021865Portland STP-BiosolidsIncompleteN/ANashville---
  • 1 - 2 of 2

Permit Documents

View
SpreadsheetPT PTL Spreadsheet15-JUL-2024
LetterPT PTL Town Letter15-JUL-2024
Notice of ViolationPT SAR NOV for Late Report11-JUL-2024
ApplicationUPDATED VIA EMAILS 05-JUL-24 and 09-JUL-24: Form 2A by Mike Callis added to RCVD VIA DOWNLOAD 28-JUN-24: contacts, Form 2A, map, flow diagram, DMR summary, and reports by Megan Heisler09-JUL-2024
Notice of Violation2024 NOV- , inaccurate data handling and reporting, the volume of overflows in the collections system, numerous effluent violations, and inadequate operation and maintenance of treatment structures and sampling equipment03-JUL-2024
Letter24.0227 Approval letter 2024053030-MAY-2024
Letter24.0289 Approval letter 2024052323-MAY-2024
Letter24.0325 Plans Approval LTR 2024052020-MAY-2024
LetterWPN 24.0148 Approval Letter03-MAY-2024
LetterWPN24.0160 Approval Letter 2024040101-APR-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:Permit ViolationsCommissioner's OrderMoratorium on Connections see Item 8 under Order & Assessment Section (page 15).4/18/2017Active58

Inspections

19-DEC-2006Biosolids InspectionMinor Deficiency Noted
08-MAR-2010Compliance Biomonitoring (CBI)In Compliance
17-JUN-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
18-AUG-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JUL-2020Compliance Eval (non-sampling) (CEI)Out of Compliance
24-MAR-2016Compliance Eval (non-sampling) (CEI)Out of Compliance
02-MAY-2012Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
01-JUN-2007Compliance Eval (non-sampling) (CEI)NOV
09-DEC-2010Compliance Sampling (CSI)In Compliance
03-MAR-2021Follow-upOut of Compliance

Wastewater Engineering Plans Review

24.0289ApprovedCDMJB5/23/20245/23/2024Parkside Pointe SPS & Force main
24.0325ApprovedCDRGO4/30/20245/20/2024Bracken Estates - Sanitary Sewer Plans
24.0227ApprovedCDMJB4/1/20245/30/2024Parkside Pointe
24.0160ApprovedCDMJT3/1/20244/1/2024Sanitary Sewer Rehab of Portland Sudden Service
23.0747ApprovedCDTNH3/1/20243/26/2024HWY 52E No. 1 Lift Station Relocation
24.0148ApprovedCDJKM2/27/20245/3/2024Harbin Sandye Avenue - Sanitary Sewer Collection Plans
23.0560ApprovedCDJKM2/26/20242/28/2024Richland Estates Subdivision – Sanitary Sewer Collection Plans
24.0015ApprovedCDTNH2/2/20242/5/2024N Harris Ln Sewer Extension
23.0629ApprovedCDTNH1/29/20241/29/2024Twin Lakes
23.0350ApprovedCDTNH7/5/20237/28/2023Collins Sewer Extension