Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5840White Pine STP1280 Blue Bonnet LaneWhite PineJeffersonKnoxville

Permit Information

TN0064971
Individual
Reissuance
Town of White Pine
White Pine STP
Treatment of municipal sewage via activated sludge (Aero-Mod) and ultraviolet light disinfecting
I
M
MW
31-JUL-2024
15-NOV-2019
02-AUG-2024
12-NOV-2024
24-JAN-2020
01-FEB-2020
31-JAN-2025
French Broad River at mile 67.9 (Douglas Reservoir)
treated municipal wastewater from Outfall 001
activated sludge, chorination/dechlorination, aerobic digestion, sludge dewatering (filter press)
4952
.389
06-NOV-2024 03:13PM

Other DWR permits at this site

Permit Documents

View
ApplicationApplication for Permit Renewal31-JUL-2024
ApplicationTN0064971 Application for permit modification25-NOV-2019
ApplicationRCVD VIA EMAIL 31-MAR-15: part of NPDES app by Stanley Wilder.31-MAR-2015
ApplicationRCVD 24-MAR-15: NPDES app by James Sunstein.24-MAR-2015
Draft Permitdraft NPDES permit 202412-NOV-2024
Draft Permitdraft permit 2019_revoke and reissue to encompass both permit reissue and modification in 202011-DEC-2019
Draft Permitdraft for renewal -August pub notc11-AUG-2015
EmailDocumenting 1 sewer tap for failing septic connected to sewer. 4 preexisting committments remain.18-MAY-2023
EmailE-mail documenting conversation with White Pine regarding status of SSES and authorizing one connection to sewer due to failing septic.14-APR-2023
EmailCollections Operator Enrolled in MyTDEC Forms document27-FEB-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

13-NOV-2020Compliance Eval (non-sampling) (CEI)In Compliance
17-MAY-2011Compliance Eval (non-sampling) (CEI)In Compliance
11-AUG-2009Compliance Eval (non-sampling) (CEI)In Compliance
23-JUN-2008Compliance Eval (non-sampling) (CEI)In Compliance
02-APR-2014Compliance Eval (non-sampling) (CEI)NOV
23-JAN-2024Compliance Sampling (CSI)Out of Compliance
22-SEP-2021Sanitary Sewer SystemOut of Compliance
30-APR-2018Compliance Eval (non-sampling) (CEI)Out of Compliance
16-AUG-2016Compliance Eval (non-sampling) (CEI)Out of Compliance

Wastewater Engineering Plans Review

13.0324Review CompletePERJMS5/29/20137/3/20132013 CDBG - City of White Pine Inflow and Infiltration Project
17.0694ApprovedLINEMNU10/10/201711/1/2017Lakeway Christian Academy
18.0410Review CompletePPDWDM3/28/20185/23/2018Town of White Pine POTW Upgrade/Replacement
18.0468Approved-MNU7/3/20187/25/2018Stonebrook S/D
18.0342ApprovedPERWDM4/2/201811/16/2018White Pine PER
19.0652ApprovedCDGCG3/5/20203/5/2020White Pine WWTP Upgrade and Expansion
22.0490ApprovedCDA. Bahour8/2/20228/30/2022Town of White Pine Water and Sewer Specifications
23.0062ApprovedCDMJB4/15/20235/11/2023Town of White Pine Sewer Bypass
24.0407Review CompletePERTNH5/23/20246/17/2024White Pine Sewer Bypass PER
24.0699ApprovedCDTNH10/3/202410/4/2024Town of White Pine ARC Sewer System I&I Repairs