Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
12892Tennessee Wastewater Systems, Inc. - Eudailey Treatment FacilityCovington Eudailey RoadFranklinWilliamsonNashville

Permit Information

SOP-05036
SOP
Reissuance
Tennessee Wastewater Systems, Inc.
Eudailey Treatment Facility
Septic tanks, collection system, recirculating sand filter, membrane filter bioreactor & drip irrigation areas totaling 82.24 + acres to serve the Eudailey Treatment Facility.
N/A
M
DI
29-OCT-2020
23-AUG-2010
20-NOV-2020
08-DEC-2020
30-APR-2021
01-MAY-2021
30-APR-2026
N/A
No discharge allowed from this system
Septic tanks, effluent collection system, 0.12 MGD recirculating sand filter, 0.25 MGD membrane filter bioreactor and 48.2 acre fenced drip irrigation area.
.785
26-NOV-2024 11:31AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR240641Tennessee Wastewater Systems, Inc.Eudailey-Covington Force Main and Reuse Main ExtensionCGPInactiveN/ANashville-28-APR-2016-
TNR145836Tennessee Wastewater Systems, Inc.-CGPInactiveN/ANashville-15-OCT-2007-
  • 1 - 2 of 2

Permit Documents

View
MemoREF 14-JUL-11: memo re: SOP Template - Summary Comments by TDEC.14-JUL-2011
Inspection Report05-MAR-14 LBS insp report05-MAR-2014
Old PermitSOP Permit29-JUN-2014
ReportRCVD VIA EMAIL 13-MAR-15: report re: inspection frequency database from Brian Carter.13-MAR-2015
LetterRCVD 25-MAR-15: letter to Brad Harris re: Vineyard Valley Subdivision by Jamie Reed of SEC.25-MAR-2015
LetterProposal for increased capacity at the existing treatment facility.20-MAY-2015
ApplicationRCVD VIA EMAIL 27-JUL-15: SOP drip app w/ no check by Charles Hyatt.27-JUL-2015
ApplicationRCVD 28-JUL-15: letter to Hari Akunuri re: ck# 5448 for $3800 by Keith Townsend.28-JUL-2015
LetterSOP-05036_Eudailey_Notice_of_Complete_Application03-AUG-2015
MemoSOP-05036 UIC Preliminary Approval02-NOV-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

02-JUL-2024Compliance Evaluations (non-NPDES)In Compliance
01-FEB-2024Compliance Evaluations (non-NPDES)Out of Compliance
20-NOV-2019Compliance Evaluations (non-NPDES)Immediately Corrected During Inspection
05-MAR-2014Compliance Evaluations (non-NPDES)Minor Deficiency Noted
15-APR-2008Compliance Evaluations (non-NPDES)In Compliance
14-AUG-2007Compliance Evaluations (non-NPDES)In Compliance

Wastewater Engineering Plans Review

22.0161ApprovedCDRGO3/14/20224/3/2022The Eudailey Treatment Facility Addition Phase 1
21.0832InactiveCDTNH3/12/2022-The Grove Sec 11 Eudailey Treatment Facility Modification
22.0117ApprovedCDRGO3/2/20223/12/2022The Grove Sec 11 Eudailey Treatment Facility Modification
21.0831Review CompletePPDTNH11/9/2021-The Grove Sec 11 Eudailey Treatment Facility Modification
21.0738ApprovedCDTNH10/11/202110/13/2021The Grove Collection Lines
20.0074ApprovedCDARa2/12/20202/26/2020The Grove Phase 10
19.0466ApprovedCDARa8/7/20198/15/2019The Grove 6-B Subdivision - Eudalley Treatment Facility
18.0903ApprovedCDARa11/14/201811/27/2018Falls Grove S/D Phase 6 and 7
18.0757Review CompleteASBUILTSARa8/28/2018-Vineyard Valley Drip Installation
18.0714ApprovedCDARa8/13/20188/21/2018Lampkins Bridge Force Main & Reuse Main Extension