5213City of Sneedville STP306 Harrison StreetSneedvilleHancockJohnson City

Permit Information

TN0026638
Individual
Reissuance
Town of Sneedville
Sneedville STP
AER-O-MOD activated sludge treatment system with influent equalization and post chlorination
I
M
MW
30-JUL-2024
06-JUN-2024
30-JUL-2024
19-NOV-2024
05-FEB-2020
01-MAR-2020
31-OCT-2024
Clinch River at mile 177.4
treated municipal wastewater from Outfall 001
AER-O-MOD activated sludge treatment system with influent equalization and post chlorination
4952
.155
17-NOV-2024 10:17PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
MemoEFO Rationale for a Grade III WW Certified Operator30-OCT-2006
LetterSneedville WWTP notifcation of bypass of treatment 6/9/2013-6/12/201324-JUL-2013
LetterSneedville WWTP notifcation of bypass of treatment 6/9/2013-6/12/201324-JUL-2013
LetterSENT 11/20/2013: Report of complaint investigation - confirmed STP effluent emerging above ground in field and entering Greasy Rock Creek, noted concerns with STP operation and maintenance (Letter signed by Chris Rhodes, JCEFO DWR EPM)20-NOV-2013
LetterRCVD 12/4/2013: City of Sneedville response to 11/14/2013 complaint investigation re: blocked effluent line/effluent flowing across field, O&M issues noted at Sneedville WWTP04-DEC-2013
LetterRCVD 2/14/2014: Sneedville WWTP notifcation of 1/2014 bypass of treatment (1/11/2014-1/14/2014)13-FEB-2014
LetterRCVD 3/14/2014: Sneedville WWTP notifcation of 2/2014 bypass of treatment (2/3/2014-2/7/2014)13-MAR-2014
LetterRCVD VIA EMAIL 6/13/2014: Letter from City of Sneedville regarding resignation of certified WWTP operator on 5/30/2014, search underway for a new operator13-JUN-2014
Old PermitTN0026638 for 11-1-2014 issuance31-OCT-2014
FormRCVD 12/17/2014: Report regarding 12/8/2014 overflow from Sneedville STP (TN0026638) collection system15-DEC-2014
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Overflows:WWTP OverloadEFO CommunicationChris Rhodes email dated 4-Apr-20194/4/2019Watch List62

Inspections

10-MAY-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
10-MAY-2024Sanitary Sewer Overflow Non-SamplingOut of Compliance
11-SEP-2019Compliance Eval (non-sampling) (CEI)Out of Compliance
11-SEP-2019Sanitary Sewer Overflow Non-SamplingOut of Compliance
11-APR-2017Compliance AssistanceImmediately Corrected During Inspection
19-DEC-2014Follow-upCRM Requested
30-JUN-2014Compliance Eval (non-sampling) (CEI)Order Requested
22-SEP-2009Compliance Eval (non-sampling) (CEI)NOV
10-MAY-2006Reconnaissance (RI)NOV

Wastewater Engineering Plans Review

22.0508ApprovedCDMNU8/5/20229/22/2022S.R. 33;Bridge Over Greasy Rock Creek, L.M. 11.77 (IA) Sewer Relocation
22.0509ApprovedCDMNU8/5/20228/24/2022City of Sneedville Sanitary Sewer Improvements Phase 6
15.0324ApprovedSTPMODMNU5/26/20157/7/2015WWTP Blower Improvement Project
14.0800ApprovedLINEA. Bahour3/25/20143/26/2015Phase 2 & 3 Sewer Replacement
18.0604Review CompletePPDAWJ7/27/2018-Sneedville Sewer System Improvements Project