Skip to Main Content
Site IDParent SiteLocationCountyEFO
33631Black CreekRiver Gorge DriveHamiltonChattanooga

Inspection Details

37976
33631
TNR110218
1/16/2013
Stormwater Construction Non-Sampling
Follow-up Inspection Required
PKB observed problems with the erosion prevention and sediment control system at the site and informed project manager Brian Pimberton via phone of the issues and of the need to correct them asap.