5793BNA (Tate) Terminal Apron ExpansionOne Terminal Drive, Suite 501DavidsonNashville

Inspection Details

100484
5793
TN0064041
2/3/2022
Compliance Sampling (CSI)
Out of Compliance
Facility is largely in compliance. SWPPP is being kept up to date and used to minimize stormwater impacts. Site treatment structures are in good condition. IMP003A is being sampled in a location that has groundwater dilution and should be moved. D.O. probes are not being calibrated, no calibration records for other parameters. Since December 2018, 10 months had missing parameters that were simply not collected. Primarily due to personnel turnover, has been addressed.

Samples performed during inspection were all within permit limits. 002, 003, and 004 were not discharging and so were not sampled.