Skip to Main Content
Site IDParent SiteLocationCountyEFO
5172Henning Water Systems/ Waste Water Pump Station259 Morris Ferry RoadLauderdaleJackson

Inspection Details

34865
5172
TN0025011
5/17/2012
Reconnaissance (RI)
Follow-up Inspection Required
Cordell Walton told me the Mayor said a grant had been approved and that the money would be used to repair the lagoon levee, the actuator valve and the bridge.

Cordell said the Town had stored a confiscated car in the garage at the lab. A contract lab is picking up samples in Henning except for a bacteria sample Cordell takes to the State lab in Jackson, usually the first Thursday of the month. The lagoon grounds, except for the inside of the levees and the spray field had been mowed.