Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Inspections
Inspection Details
Site ID
Parent Site
Location
County
EFO
5045
Dyer STP
199 Becton Drive
Gibson
Jackson
Inspection Details
Inspection Number
39921
Site ID
5045
Permit Number
TN0021563
Inspection date
6/14/2013
Inspection type
Sanitary Sewer Overflow Non-Sampling
Status
In Compliance
Notes
At 1400 HRS I arrived on site to observe a sewer break located at the intersection of HWY 77 and Old 45 West across HWY from Alford Tire Company. The sewer break was inclosed in concrete so it was determned to locate leak and lay new pipe to parallel the old line. The leak was making its way into a metal culvert and flowing into a concrete drainage canal. The leak was isolated by pumping wastewater around the leak from upstream manhole to downstream manhole. The union of the pipes had just been shoved into one another and concrete poured over it. Over time the union failed and caused the leak. To solve the problem a correct union was made and a line was laid parallel to the old line to receive the upstream wastewater flow. The fix was completed at approx. 2400HRS on the 14JUN13.