Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Inspections
Inspection Details
Site ID
Parent Site
Location
County
EFO
12612
City of Pikeville, Tennessee dba Pikeville Water Treatment Plant
38770 State Route 30 West
Bledsoe
Chattanooga
Inspection Details
Inspection Number
87989
Site ID
12612
Permit Number
TN0078581
Inspection date
12/21/2020
Inspection type
Compliance Eval (non-sampling) (CEI)
Status
In Compliance
Notes
5 pressure sand filters and sedimentation basins. The filter backwash is discharged to a 97,000 gallon basin. Settled water is recycled back into the water treatment process. The system does not typically discharge except during annual maintenance. The basin is drained once a year over a 15 hour period. Accumulated sludge is collected and land applied. Discharge is analyzed for pH, TSS and chlorine residual by the City of Pikeville's WWTP lab. Metals ( Al and Fe ) are analyzed by a contract lab. There was an exceedance of Aluminum (0.966mg/L)/ 0.75 mg/L in the September 2020 sample. The exceedance was attributed to sampling error. Outfall signage is in place. There was no evidence of pollutants entering the wet weather conveyance leading to the receiving stream.