Skip to Main Content
Site IDParent SiteLocationCountyEFO
5655Monteagle WTP400 Chickory LaneMarionChattanooga

Inspection Details

110623
5655
1/24/2023
Technical Assistance Visit
In Compliance
We met with the system operator, Wayland Stewart and the distribution coordinator, John Condra. the flow meter was removed for repair and has not been replaced. The flow is being estimated by the amount of time that the plant operated. The backflow devices have been tested, but the reports have not been provided to the water system. A meeting is being scheduled with the mayor so that all parties are on the same page in keeping the water system in compliance. We were onsite for approximately 2 hours.