Skip to Main Content
Site IDParent SiteLocationCountyEFO
139314Aspire ParkYarnell RoadAndersonKnoxville

Inspection Details

114283
139314
TNR135885
12/21/2023
Stormwater Construction Non-Sampling
Out of Compliance
The stream buffer near stream one was disturbed with grading occurring up to the stream bank and the wetland buffer near wetland C was also disturbed. Sediment from the construction activities was observed in stream one at multiple locations. The steep hillside that makes up the bike park lacked adequate erosion prevention and sediment controls (EPSCs). Will conduct a follow up inspection on 1/05/2024 to discuss concerns with site supervisor.