99455Big Creek Utility District & Big Creek WTP9573 SR-56 (HCR 76, Box 50)GrundyChattanooga

Inspection Details

109197
99455
1/18/2023
Sanitary Survey
In Compliance
Cross connection program implementation has improved since last survey. A master list or inventory of back flow preventers in the system would make it easier for water system personnel to track compliance. Clearwells have been inspected. A screen is required on the overflow on the old clearwell. Repairs have been completed on the concrete filter backwash drying beds. A contract has been awarded for the replacement of valves and actuators in the pipe gallery, work is expected to be completed in 2023. Painting is planned for the pipe gallery when the work is completed.