Skip to Main Content
Site IDParent SiteLocationCountyEFO
170421Pleasant Grove Farms - Phase 2Pleasant Grove RoadSumnerNashville

Inspection Details

116157
170421
NR2304.076
4/23/2024
ARAP Compliance Inspection
Out of Compliance
Road crossing culvert has been installed, though the road has not yet been completed. Although the banks on the downstream end of the culvert have been stabilized, areas on the upstream end of the culvert are not stabilized or protected with EPSC measures and are allowing sedimentation into channel, with high potential of impacts downgradient during the next rain event. Upland and upstream areas need stabilization and EPSCs to prevent further impacts. See photolog.