Skip to Main Content
Site IDParent SiteLocationCountyEFO
123017Davis Creek Energy, LLC, Area # 6 (Alden Resource, LLC)Westborne LaneCampbellKnoxville

Inspection Details

112092
123017
TN0070408
5/8/2023
Follow-up
In Compliance
This site was inspected in response to notification that work had been completed to stabilize the landslide as per the CAP plan. Pond 103 has been removed and regraded. A rock-lined channel has been constructed down the landslide and tied into an existing wet weather conveyance. The channel and conveyance drain water off of the landslide. The areas were hydroseeded. Please refer to the supplemental inspection report for a complete inspection report.