Skip to Main Content
Site IDParent SiteLocationCountyEFO
183190Memphis Regional Megasite WWTP101 Fredonia LoopHaywoodJackson

Inspection Details

118667
183190
TNR122630
11/20/2024
Stormwater Construction Non-Sampling
In Compliance
Project area completed. Once the washout area north of the WWTP has been sufficiently stabilized (either by vegetative measures or non-erodible material) and silt fence removed, the project site would appear to meet termination criteria and a Notice of Termination form submitted to the Division.