Skip to Main Content
Site IDParent SiteLocationCountyEFO
152239The Grove at Cedar HillsBeals Chapel Road SE of Martel RoadLoudonKnoxville

Inspection Details

92761
152239
TNR136089
8/25/2020
Stormwater Construction Non-Sampling
Out of Compliance
Please continue stabilization measures throughout the site, especially in the location of the entrance, basin, and site trailer. It is highly recommended that the lower basin be constructed according to the terms and conditions in your CGP coverage. This will aid in the treatment of stormwater and prevent violations to water quality criteria of the receiving waters. As mentioned previously, the basin will need to be signed off by your engineer to ensure compliance with the rules and regulations.

A follow-up inspection will be conducted next week to determine if the improved BMP measures are enough to prevent sediment from leaving the site.