Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Inspections
Inspection Details
Site ID
Parent Site
Location
County
EFO
6444
Bristol/Bluff City Utility District WTP
318 Riverview Drive
Sullivan
Johnson City
Inspection Details
Inspection Number
92251
Site ID
6444
Permit Number
TN0075884
Inspection date
8/4/2020
Inspection type
Follow-up
Status
In Compliance
Notes
Mr. Jason Woods of the Bristol/Bluff City Utility District WTP contacted me to request an onsite follow-up visit to ensure the newly implemented and soon to be implemented lab QA/QC was being done properly, and also to provide the opportunity for the other lab personnel (who were not present during the July 17, 2020 CEI) to ask questions. Mr. Josh Boggan asked for the inspection to be conducted virtually in order to minimize contact due to COVID-19 restrictions, so I arranged to speak with Mr. Woods via conference call on 8/4/2020. There have also been multiple emails exchanged instructing him on proper procedures for the required lab QA/QC. As of 8/5/2020, Mr. Woods had implemented the QA/QC procedures needed for pH and I had advised him on how to conduct the QA/QC for TRC. I sent him example bench sheets that he could use to design his own lab paperwork to assist him in keeping up with the QA/QC schedule. He informed me that he would be starting the MDL for TRC sometime this week.I advised him to keep me updated on their progress, and offered to review any new bench sheets to ensure they are collecting all the necessary data for each parameter.