Skip to Main Content
Site IDParent SiteLocationCountyEFO
73976PNG Gas Line - Hillsboro PikeHillsboro PikeDavidsonNashville

Inspection Details

39458
73976
NRS12.225
5/15/2013
Follow-up
Follow-up Inspection Required
The bentoninte material had been removed from Otter Creek. Piedmont agreed to remove some uncosolidated soil in the wet weather conveyance near the confluence of Otter Creek where the bentonite had entered Otter Creek. The Division of Natural Areas (DNA) was present and was evaluating the areas that had been disturbed by the foot paths caused by the clean-up efforts. DNA will provide a recommendation as to how to stablilze these areas.