Skip to Main Content
Site IDParent SiteLocationCountyEFO
6478Springfield Water and Wastewater Department6213 Smith RoadRobertsonNashville

Inspection Details

6565
6478
TN0077925
1/24/2007
Compliance Eval (non-sampling) (CEI)
In Compliance
WTP began operation 18 Aug 1980. 10 mgd design capacity; currently (2007) pumping about 5.0 mgd annual average, 6.0 mgd peak.