Skip to Main Content

Inspection Details

119130
107946
TNR192064
1/3/2025
Stormwater Construction Non-Sampling
In Compliance
Road between HWY 25/70 and 25E to rough grade . Road between HWY 160 and HWY 321 to rough grade. Cut and fill slopes throughout project have been stabilized with temporary or permanent stabilization. Additional repairs to bridge abutments will be made from Helene flooding. n compliance.