Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Inspections
Inspection Details
Site ID
Parent Site
Location
County
EFO
5968
Water Authority of Dickson County -Jones Creek STP
1198 Rock Church Road
Dickson
Nashville
Inspection Details
Inspection Number
66725
Site ID
5968
Permit Number
TN0066958
Inspection date
2/7/2019
Inspection type
Compliance Assistance
Status
In Compliance
Notes
Their effluent flowmeter was struck by lightning and is non-functional, their samplers are on high ground in case additional flooding occurs tonight, there had been approximately two feet of water in the lab building so they are unsure if the outlets are still functional; most of their lab equipment was on counters above the water so should still be usable; fencing is down around portions of the facility; the outfall sign is still there but had fallen over; an overflow had occurred from the manhole immediately upstream of the influent sampling and wastewater definitely reached the stream. Their collection system operator has been in touch with Lilia about their overflows. No evidence of the overflow remained in the stream, and they will clean up the remainder of the solids on the ground once it’s safe to get equipment out there to do it. We confirmed that three of the four baffle walls in the chlorine contact chamber were effectively destroyed. Many records are likely unsalvageable.
The color of the oxidation ditch was good, it did not appear thin or like there had been washout. No treatment structures other than the contact chamber were overtopped. They had already moved their chlorine feed line as far upstream in the process as they could to add contact time.