152239The Grove at Cedar HillsBeals Chapel Road SE of Martel RoadLoudonKnoxville

Inspection Details

92232
152239
TNR136089
8/6/2020
Stormwater Construction Non-Sampling
In Compliance
Technical assistance meeting to discuss how to address sedimentation at the construction entrance. Operator will develop a ditch system to convey onsite stormwater runoff. Furthermore, the operator will construct an improvised ditch/basin line with riprap at the entrance. A follow-up will conducted in approximately two weeks.