Skip to Main Content

Inspection Details

100488
5375
TN0060771
7/14/2022
Compliance Eval (non-sampling) (CEI)
In Compliance
This facility was inspected on July 14, 2022. Stormwater runoff and groundwater are directed into two pits. Water from the wash plant is directed into a large settling pond which is in the process of being dredged as equipment is available. Water from the pits is primarily reused on site for the wash plant or dust suppression. The final settling pond was fairly low and there was no evidence of recent discharge. No issues noted at this site.