Skip to Main Content
Site IDParent SiteLocationCountyEFO
132815Broady Glen Subdivision1921 Marietta Church RdKnoxKnoxville

Inspection Details

99915
132815
TNR135840
4/20/2021
Stormwater Construction Non-Sampling
In Compliance
Met onsite with Developer, Hunter Harrison and Contractor, David Siler from the Pipe Doctor. EPSCs are installed and functioning properly and all inactive areas/slopes have been stabilized. Inlet protection has been installed in all inlets and have been well maintained. One small corner has some erosion issues. Discussed with developer and contractor and they are planning on installing bank stabilization. Sediment basin is installed and functioning properly, outfall discharge is running clear.