5805Henderson STP- North Lagoon3310 US Hwy 45 NorthChesterJackson

Inspection Details

49572
5805
TN0064220
6/22/2016
Pretreatment Compliance (oversight)
In Compliance
See PCI for full report.
Briefly, the city has a new Utility Director who is highly regarded. Permits are being rewritten. New UST site added.
Premier has all new management and an all new PT system which appears to be properly sized. Premier has not been in SNC for some time. Site visit showed a well run operation now. The city and IU will start using the same sampling point. Premier had 6 totes of acid or caustic. Two were over a trench drain, but a major rupture would have flooded out a nearby outside door. Three more were stacked right by the same door. In the new line building, there was another tote by an outside door.