Inspection Details

99439
105595
357028
3/10/2022
Safety
Out of Compliance
Based on this inspection, the dam was in unacceptable condition at the time of the inspection. The height and density of tree and other vegetative growth on the upstream slope, downstream slope, and around the principal spillway outlet prevented the Division from being able to complete its inspection of the dam. Therefore, the Division cannot issue the Certificate of Approval and Safety for Operation of this dam.

In addition, the erosion notch/gully at the downstream toe of slope at the lower left abutment/groin area must be addressed to prevent it from undermining the toe of the downstream slope.