Compliance Eval (non-sampling) (CEI)
In Compliance
All process and stormwater is directed to the quarry pit. Most water is reused on site or at adjacent concrete precast manufacturer, reducing discharge frequency and volume. The outfall was not discharging at the time of the inspection, and there was no evidence of oils or solids staining on the discharge channel. pH buffer on hand was out of date, but expired after the last discharge. New buffer was available and the expired immediately discarded. No other issues noted.